![]() |
![]() |
#11 |
Regular Poster
Join Date: Aug 2017
Posts: 117
|
![]() I agree there are many priorities and bottle necks though there were many naysayers when phase 1 of WRC was reopened and data has shown that passenger numbers have surpassed what Irish rail had estimated before the line reopened.
The WRC is a piece of national rail infrastructure which would provide a fantastic rail option in the west and link south and north via WRC. Rail projects should not be limited to Dublin only though I accept that it’s time to link Navan by rail to Dublin. |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|