![]() GCD is a real problem alright. I have seen talk of an exit at the north end but nothing detailed.
It's currently close to being unsafe
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#2 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() Passenger flow and platform congestion are potentially an issue at all the city centre stations to one degree or another. Pearse is the best equipped to cope with additional traffic, Tara Street is restricted both in terms of platform surface area and access. Connolly likewise can be congested, particularly in respect of platform 6 & 7 arround the access ramp.
The Phoenix Park tunnel trains will probably be modestly loaded by the time they reach Grand Canal Dock but will obviously put pressure on already unsatisfactory access arrangements. |
![]() |
![]() |
![]() |
#3 | |
Regular Poster
Join Date: Mar 2006
Posts: 180
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#4 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() So, has the north strand- entrance into Connolly been resolved?
At the moment we can have waits into Connolly because the track used to enter Connolly has to he shared with northbound services , has this / will this be sorted when this happens? The last thing you want is maynooth trains stuck at glasnevin junction waiting on inbound Kildare trains, then stuck again at north strand! |
![]() |
![]() |
![]() |
#5 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Not really as you have parallel movement when you have a Maynooth line Docklands service and a Park Tunnel train
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#6 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() Ah okay.
But what about the stretch of track from drumcondra into Connolly? Will that be sorted? |
![]() |
![]() |
![]() |
#7 | |
Really Regular Poster
Join Date: Aug 2013
Posts: 602
|
![]() Quote:
There is plenty of space to operate 4 extra trains during the peak - really this is a non-issue. |
|
![]() |
![]() |
![]() |
#8 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() |
![]() |
![]() |
![]() |
#9 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() First parts of a new bridge have appeared at Grand Canal Dock
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#10 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Was that (GCD mention) meant to be in a different thread MG?
|
![]() |
![]() |
![]() |
#11 |
Member
Join Date: Oct 2006
Posts: 395
|
![]() Don't think so. This thread is about Portlaoise/Kildare services using the PPT to reach GCD. Talk of Docklands/Croke Park are red herrings for 2 reasons 1) it's not possible and 2) much bigger catchment in the Connolly/Tara/Pearse/GCD area.
|
![]() |
![]() |
![]() |
#12 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Kilocharlie, the question was whether MG had intended to post the content elsewhere since the quote embedded was not from this thread, not that GCD was OT this discussion.
|
![]() |
![]() |
![]() |
#13 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#14 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|