![]() |
![]() |
#9 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() How far would the 80m esimated cost of the Luas link-up go towards the Stephen's Green-Charlemont Metro surfacing at Iveagh Gardens? I could live without the linkup if it meant we'd get a joined-up Metro from Swords to Cherrywood in 2012.
|
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|