Unread 07-06-2006, 13:22   #20
Derek Wheeler
Registered user
 
Derek Wheeler's Avatar
 
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
Default

RPA have conceeded that 40M trams should have been on the line from the outset. Additional sections have been ordered. Talk of 50M is also floating around. This overcrowding issue goes right back to when the Luas was first mooted. Those designing it knew it was a cheap version of what was really needed and perhaps had absolutely no idea of demand levels between Heuston and the city centre. However the little jack Russel on the corner of Kingsbridge knew.

As for the dedicated shuttle. Connex provided one from Heuston at approx 8am recently. I assume its still running. But that appears to be it. All it takes is one Luas unit dedicated to it all day.

Unfortunetly, I fear a serious accident may occur, particularly on Saturdays. In short it needs more money for more units asap.
Derek Wheeler is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 15:08.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.