![]() |
|
![]() |
#1 | |
Member
Join Date: Oct 2006
Posts: 395
|
![]() Quote:
Don't see why the extra 51 should be any different from the existing 3-car sets. Introducing a variant only complicates deployment. Anyway luggage racks are used on commuter service mostly for fold-up bikes. Removing them would a retrograde step. |
|
![]() |
![]() |
![]() |
#2 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() The 51 coaches on order are identical to the existing fleet in all aspects
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#3 |
Member
Join Date: Feb 2009
Posts: 46
|
![]() When is the 4th track due to be commissioned? Must be nearly there.
|
![]() |
![]() |
![]() |
#4 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() The 4 track was commissioned on December 6th 2009. Between December 2009 and late spring 2010 all 4 tracks were in daily use.
The relay of track 2 (down slow) is currently underway and will complete in January 2011 Speed limit on the relayed down fast has been increased to 100mph from its original 90mph, all trains allocated to the fast line are capable of 100mph
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#5 | |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
![]() Quote:
__________________
26271 12-60 |
|
![]() |
![]() |
![]() |
#6 |
Member
Join Date: Oct 2006
Posts: 395
|
![]() |
![]() |
![]() |
![]() |
#7 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() If you look at the timetabling the 17:15 if overtaken would delay the 17:35 to Waterford
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|