![]() People, be reasonable and see the big picture here please.
Quote:
The report is available on www.iot.ie so you can judge for yourself. In this case the report looked at the Irish Rail plans first, and as I recall spent alot of time on them. Remember also that the original engineers were probably told "we want it to go from here to here" and had to work with that. It also looks like they didn't bother to bring in the population centres along the way (see http://www.inchicoreDARTstation.com) Quote:
(2) CIÉ/IR Failed to comply with the Aarhus Convention, which is a European directive which it has taken Ireland 10 years to implement (not quite there) (3)Assurances from CIÉ are not worth the paper they are printed on, and you as a passenger should know that. (4) It is way more than noise abatement etc. Consider that you lived in a small terraced house with no front garden and a small road in front of you, and then a soccer pitch. Now consider a gantry big enough for a Tunnel Boring Machine big enough for 2 railway sized tunnels, all the spoil for 3.5 Km coming out, and all this operating on a 24 hour basis for 5 years? And all this when there is a 72 acre site a few hundred metres away, largely empty and an even larger industrial site to the west of that with multiply vacant units. Quote:
(1) It should be done properly (2) All stakeholders must be consulted fully (not just informed by glossy brochures and spin)
__________________
! Last edited by Oisin88 : 04-03-2010 at 08:16. Reason: big post, small screen |
|||
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|