I have to agree here.

The advertising is good up to a point, but two weeks notice is insufficient in my opinion. I've also yet so see an actual completion date. "Early Autumn" give a lot of leyway.

There should be no reason for the closure to take so long. It should be a case of do everything that can possibly be done with the line running, then shut it down for the minimum possible time and work like crazy 24/7 until it can reopen. Contractors should have a scheme in place where they're paid a bonus for early completion and penalties for delays.

I would think that when the line is complete there should still be a decent service out of Connolly. There's no way the point will need the same frequency as Connolly-Heuston. Will trams run Connolly-Point as well?

I think we're sometimes too willing to let IE/RPA away with stuff. This should have been thought out properly in the first place, and we shouldn't have to listen to excuses.
James Shields is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 22:29.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.