Default Enfield

I note Meath Co. Co. have granted planning subject to conditions for a footbridge at Enfield. Unfortunately the crap planning system does not appear to give access to the drawings etc. (app no TA111171). Is this just enhanced access or have they a notion of putting a 2nd platform in?
dowlingm is offline   Reply With Quote
Unread 19-04-2012, 20:51   #2
Traincustomer
Member
 
Join Date: Dec 2008
Location: ar an traein
Posts: 602
Default

Interesting. The second platform is a little overgrown in parts and would need some (but not massive) attention to bring it up to an useable standard. It is not as long as the platform that is used and appears a little low. Given the signal cabin building on that side is disused (well for signalling purposes in any case) there is a possibility of enhanced access or bringing the platform back into use.
Traincustomer is offline   Reply With Quote
Unread 20-04-2012, 14:09   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Reads as a full section M footbridge, but with ramps instead of lifts which massively reduces costs

The platform will need a total rebuild as it will be slightly too low and missing tactile paving, lighting and drainage, it will also need to be 170m long. No planing application will be require for that
Mark Gleeson is offline   Reply With Quote
Unread 23-04-2012, 10:52   #4
cullenswood
Regular Poster
 
Join Date: Jul 2008
Posts: 34
Default

Quote:
Originally Posted by Mark Gleeson View Post
Reads as a full section M footbridge, but with ramps instead of lifts which massively reduces costs

The platform will need a total rebuild as it will be slightly too low and missing tactile paving, lighting and drainage, it will also need to be 170m long. No planing application will be require for that
Will this have any beneficial impact on scheduling to Enfield and further when it is complete?
cullenswood is offline   Reply With Quote
Unread 23-04-2012, 13:31   #5
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Short term no impact, but when trains are delayed it means things will move a lot better than before

For Enfield passengers likely to mean several more services

Future timetables will no longer have the restriction at Enfield.

That leaves us with only Millstreet and Clara as the only two odd stations with 1 platform but two tracks
Mark Gleeson is offline   Reply With Quote
Unread 23-04-2012, 15:55   #6
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Roscrea?

EDIT: Roscrea seems to have two tracks and two platforms, but only one is usable.
__________________

Last edited by Colm Moore : 23-04-2012 at 16:29.
Colm Moore is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 06:48.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.