18-01-2007, 16:52 | #17 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
MAybe 2007 should be better "on paper" than 2006 if it has been thought out better. However there is a big pitfall, already apparent from the delay at Thurles yesterday: more fraquent trains mean that if one breaks down there are likely to be several behind it which will be severely delayed. Also more difficult to get a rescue loco to the spot. Maybe there need to be a standby loco at about Portlaoise and also easier facilitation of single-line worknig
|
Thread Tools | Search this Thread |
Display Modes | |
|
|