Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Dublin Belfast
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 02-06-2007, 10:36   #1
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default [2-6-2007] 2 enterprise failures

Well nothing on the IE site, but Translink have this

Quote:
Latest Update 2-Jun-2007 11:00


Enterprise - 0935 Dublin Connolly to Belfast Central 2-Jun-2007 10:17
Due to a knock on from the earlier mechanical failure, the 0935hrs Enterprise service from Dublin Connolly to Belfast Central has been delayed by 15 minutes approximately.

Enterprise - 0735 Dublin Connolly to Belfast Central Update 2-Jun-2007 10:14
The 0735hrs Enterprise service from Dublin Connolly to Belfast Central is currently operating approximately 110 minutes late.

Enterprise - 1030 Belfast Central to Dublin Connolly 2-Jun-2007 9:00
The 1030hrs service from Belfast Central to Dublin Connolly will operate on time but will be serviced by a non-Enterprise train.

Enterprise - 0735 Dublin Connolly to Belfast Central 2-Jun-2007 8:20
The 0735hrs Enterprise service from Dublin Connolly to Belfast Central has failed at Malahide; an update will follow shortly.
Mark Gleeson is offline   Reply With Quote
Unread 07-06-2007, 09:40   #2
Sean Daly
New to the board
 
Sean Daly's Avatar
 
Join Date: Dec 2005
Location: Longford
Posts: 9
Default

Found this on CAF's website regarding NIR's new trains

Type of vehicle:
Diesel unit basically consisting of three cars, and an intermediate car which may be added or removed to form units with 2 to 4 cars. The operator can create consists with different number of units to a maximum of 12 cars.
Unit intended for local and regional services in Northern Ireland. The units are also designed to meet the requirements of the Railways of the Republic of Ireland as six of these trains will provide a cross border service between the cities of Belfast and Dublin. The units comply with British Railway Standards (RGS), this is a new standard related to interior shocks (AV/ST 9001), British legislation regarding safety (Safety Case) and accessibility for disabled persons

Regards
Sean
Sean Daly is offline   Reply With Quote
Unread 07-06-2007, 09:53   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Only 6 of the 23 C3K sets comply with all Irish requirements, but all 23 are allowed to run to Dublin subject to a 23 year old understanding. Its all academic anyway since the exact same rules apply north and south

Its damn fine train and decimates the Enterprise point to point timings

Best of all the nice people in Translink had the cop on to program the PIS system so when it does show up in Dublin it works perfectly
Mark Gleeson is offline   Reply With Quote
Unread 08-06-2007, 10:26   #4
MrX
Really Regular Poster
 
Join Date: Dec 2005
Posts: 585
Default

Could the 'Enterprise' (De Deitrichs) not be replaced by a small extra order of 22000 Mitsui DMUs ?

Can really see no advantage to it, as unlike the MK3s or CAF Intercity coaches they can't even do 200km/h!
The DMUs would be at least capable of doing 100mph and have good accelleration and reliability.
MrX is offline   Reply With Quote
Unread 08-06-2007, 11:14   #5
Terrontress
Regular Poster
 
Join Date: Jul 2006
Posts: 132
Default

Quote:
Originally Posted by MrX View Post
Could the 'Enterprise' (De Deitrichs) not be replaced by a small extra order of 22000 Mitsui DMUs ?

Can really see no advantage to it, as unlike the MK3s or CAF Intercity coaches they can't even do 200km/h!
The DMUs would be at least capable of doing 100mph and have good accelleration and reliability.

I think DMUs should not be used for long, prestigious routes. It is not much fun in first class having a diesel engine beneath you, vibrating away.

Better to stick to loco hauled.

I love the German loco hauled trains which move off with no noise at all.
Terrontress is offline   Reply With Quote
Unread 10-06-2007, 17:22   #6
dermo88
Member
 
Join Date: Dec 2005
Posts: 136
Default

By an International comparison, Dublin to Belfast and Dublin to Cork are neither long distance, or prestigious on the basis of population. My personal feeling is that Iarnrod Eireann and Translink are watching developments in Britain in relation to their HST2 project. This is the likely replacement for the 201 Class locomotives in Push/Pull mode on both the Enterprise and Mk IV stock.

DMU's cover similar distances to cities with similar population levels throughout the European Union on a daily basis. They do the job, they are adequate, and most customers are perfectly happy with them.

The only people who dislike them seem to be enthusiasts, although seating arrangements can be the biggest drawback on them.
dermo88 is offline   Reply With Quote
Unread 11-06-2007, 00:37   #7
MrX
Really Regular Poster
 
Join Date: Dec 2005
Posts: 585
Default

I really don't think the HST2 will have any impact on the Cork-Dublin project. They simply need powercars, there are a few pretty much off-the-shelf sollutions out there.

Irish Rail plan to use the new CAF coaches for 125mph operation on the Cork-Dublin line. They're fully designed to operate at that speed and that's always been the plan. It's just a matter of a minor tweak to the brake systems and something new to power them.

It's quite unlikely that the UK's HST2 programme will be anything other than a big purchasing campaign of something relatively off-the-shelf too. There are many suitable candidates already designed and in use in the UK.

I really can't see the point of a major upgrade to enterprise. It neither has the population, demand, distance or tracks to make it worth while.
It could benefit however, from a bit of a tweak and perhaps power cars too.

Otherwise, a 125mph tilting DMU might be the best sollution.

I still think it was madness that the Cork-Dublin fleet doesn't tilt!
MrX is offline   Reply With Quote
Unread 11-06-2007, 00:43   #8
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Quote:
Originally Posted by Terrontress View Post
I think DMUs should not be used for long, prestigious routes. It is not much fun in first class having a diesel engine beneath you, vibrating away.

Better to stick to loco hauled.

I love the German loco hauled trains which move off with no noise at all.
The current commuter cars have almost no insulation between the engine and the passengers, so if that's your only experience of DMUs, that's a fairly understandable viewpoint.

I've been on DMUs where you'd be hard pressed to tell there was an engine under the floor. The C3Ks aren't bad in this regard. Hopefully the 22Ks will be better.

The German locos may be quiet, but that's because of they have wires overhead, not because they are loco hauled per say. If they were IC EMUs, I'm sure they'd be just as quiet.

On that note, there would be a pretty strong argument for electrifying Dublin-Belfast. Not only is it a fairly modest distance, but there is commuter potential along the whole length of the line, with commuters into Belfast ant the northern end, local traffic between Newry, Dundalk and Drogheda which have been very local about stronger economic ties lately, and commuter traffic into Dublin.
James Shields is offline   Reply With Quote
Unread 11-06-2007, 00:46   #9
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Quote:
Originally Posted by MrX View Post
I still think it was madness that the Cork-Dublin fleet doesn't tilt!
Oh it tilts, alright. It's a shame it's not supposed to...
James Shields is offline   Reply With Quote
Unread 11-06-2007, 16:57   #10
tigger1962
Member
 
tigger1962's Avatar
 
Join Date: Jan 2007
Location: Kilcurry
Posts: 501
Default 19:00 Dublin belfast?

I note the 16.10 from belfast to quote translink
Due to operational difficulties the 1610hrs service from Belfast Central to Dublin Connolly will be a non-Enterprise service

i presume the 19:00 hours service will be this train also!
tigger1962 is offline   Reply With Quote
Unread 12-06-2007, 16:11   #11
byrneeo
Regular Poster
 
Join Date: Mar 2007
Posts: 41
Default

Quote:
Originally Posted by lostcarpark View Post
The current commuter cars have almost no insulation between the engine and the passengers, so if that's your only experience of DMUs, that's a fairly understandable viewpoint.

I've been on DMUs where you'd be hard pressed to tell there was an engine under the floor. The C3Ks aren't bad in this regard. Hopefully the 22Ks will be better.

The German locos may be quiet, but that's because of they have wires overhead, not because they are loco hauled per say. If they were IC EMUs, I'm sure they'd be just as quiet.

On that note, there would be a pretty strong argument for electrifying Dublin-Belfast. Not only is it a fairly modest distance, but there is commuter potential along the whole length of the line, with commuters into Belfast ant the northern end, local traffic between Newry, Dundalk and Drogheda which have been very local about stronger economic ties lately, and commuter traffic into Dublin.
There is practically no local traffic between these places. Newry customers are 90% going to dublin or belfast based on experience. Also, the station is so far out of town and not served by buses as to be nigh on worthless for those without cars. That coupled with the lack of non-enterprise services to belfast (4 a day ffs, though they are at perfect times for commuters) hardly makes electrification worthwhile, not to mention NIR's massive new expenditure in non-electric trains. Maybe an argument as far as dundalk, but traffic levels between dundalk and portadown hardly justify it, unless NIR expand their Portadown-Lurgan-Lisburn-Belfast-Bangor service to Newry, but given the need for quite a few extra sets to maintain frequency, i don't think that's a possibility. In short... i can't see electrification making sense until NIR need to renew rolling stock... in thirty years.
byrneeo is offline   Reply With Quote
Unread 12-06-2007, 16:30   #12
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

personally I wouldn't electrify the line. Based on this weeks experiences it'd blow the entire national grid to buggery
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Unread 17-06-2007, 18:05   #13
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

anyone who's been near to a Toronto streetcar will tell you electric doesn't always mean quiet Roll on the Flexitys - after the so-called tender process brings forth the name "Bombardier" as miraculously seems to happen here.

As for Dublin-Belfast - maybe it's time for the government to say "look, we know Translink doesn't have the money to go 50:50 on increasing service and god knows when they ever will. We'll pay for converting Dublin-Cork Mk3s to Enterprise, buy DVTs for the DDs and introduce clockfacing. When we replace the DDs and Mk3s we'll go 66:33 rather than 50:50"

I think the need (for Kyoto reasons among others) will outweigh the financial advantages of waiting for translink to match pound for euro (so to speak).
dowlingm is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 16:50.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.