Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Drogheda-Balbriggan-Skerries-Donabate Line
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 27-04-2009, 08:14   #1
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default [27-04-2008] 8:32 Drogheda-Pearse

8:32 to Pearse was a 4 car 2900 instead of the usual 8 car. There was also about an inch of water on the floor, like someone forgot to close the doors before going through the train washer. It was fairly full leaving Drogheda, and had quite a lot of people standing leaving Laytown.

Then the driver forgot to stop in Gormanston, and had to reverse back.

When we got to Balbriggan we were asked to change to platform 1 where an 8-car train was waiting, so we're now on proper length train, but about 20 mins late.
James Shields is offline   Reply With Quote
Unread 27-04-2009, 09:10   #2
sublimity
Really Regular Poster
 
Join Date: Jan 2008
Location: Dublin
Posts: 309
Default

Sounds like a complete farce.

The sooner the line is electrified, the better.
Replace the glorified DART's (COMMUTER) with proper DART's
sublimity is offline   Reply With Quote
Unread 27-04-2009, 10:48   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Would appear a 29k set was nicked to cover a trip to Belfast, the 7:35 Dublin Belfast Enterprise broke down
Mark Gleeson is offline   Reply With Quote
Unread 27-04-2009, 10:57   #4
sublimity
Really Regular Poster
 
Join Date: Jan 2008
Location: Dublin
Posts: 309
Default

How anyone could sit on a 29k going from Dublin-Belfast is beyond me.
Could the Mk3 international set stored in North Wall not have done it?
There has to be a better solution than a 29k...
sublimity is offline   Reply With Quote
Unread 27-04-2009, 11:02   #5
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

There needs to be a standby set in Connolly, back in the day there was the Mk2d Sligo set which made many a trip

The international set is on scrap wheels and its not really the best.

There is a citygold set in Dundalk, thats what you want

Last edited by Mark Gleeson : 27-04-2009 at 11:12.
Mark Gleeson is offline   Reply With Quote
Unread 27-04-2009, 13:49   #6
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

Quote:
Originally Posted by Mark Gleeson View Post
Would appear a 29k set was nicked to cover a trip to Belfast, the 7:35 Dublin Belfast Enterprise broke down
I thought the 29Ks weren't allowed out across the border.
Thomas Ralph is offline   Reply With Quote
Unread 27-04-2009, 19:19   #7
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Quote:
Originally Posted by sublimity View Post
The sooner the line is electrified, the better.
I dunno, if there's going to be an inch of water I think I'd sooner have diesel
dowlingm is offline   Reply With Quote
Unread 28-04-2009, 07:48   #8
roamling
Member
 
roamling's Avatar
 
Join Date: Feb 2009
Location: Lusk
Posts: 112
Exclamation

Quote:
Originally Posted by James Shields View Post
Then the driver forgot to stop in Gormanston, and had to reverse back.
this sounds like on of the the bigger jokes IR has pulled on their customers. How can a driver miss a station. Is it even possible to go back or is it against safety standards? (What about the signal has been passed!?!). I am out of words...

Last edited by roamling : 28-04-2009 at 08:01.
roamling is offline   Reply With Quote
Unread 28-04-2009, 08:19   #9
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

That probably explains the swap at Balbriggan to a different train

Pass a red signal or overshoot a platform normally means driver is taken off the train and replaced
Mark Gleeson is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 00:12.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.