Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > DART
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 17-06-2010, 09:34   #1
MugsGame
New to the board
 
Join Date: Jun 2010
Posts: 14
Default Howth-bound DART takes wrong fork at Howth Junction

Was on a Howth-bound DART yesterday evening that arrived in to Howth Junction around 8:30pm, but on the Malahide-bound platform!

The timetable, online realtime display, station display at origin, external train display (at origin and at arrival) all confirm it was a Howth-bound DART.

I jumped off along with many other confused passengers. Not sure what if anything was done to resolve this, as I was able to walk to my destination.

What can cause this sort of error - does the driver control the signals / points?

Last edited by MugsGame : 17-06-2010 at 12:56.
MugsGame is offline   Reply With Quote
Unread 17-06-2010, 10:37   #2
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The signaling records from yesterday are all over the place, the train which left Howth Junction at 20:30 was coded as a Malahide bound service.

The 19:25 Bray Howth (E932) is shown as spending 20+ minutes between Connolly and Clontraf Rd when in fact its identity swapped to the following Malahide (E828) bound train. So the train changed destination enroute

Unless manually overridden each train follows the timetabled route automatically based on its train id, only the signalman in Connolly can over ride the system

It should not happen and if it does it should be explained why

Last edited by Mark Gleeson : 17-06-2010 at 10:43.
Mark Gleeson is offline   Reply With Quote
Unread 17-06-2010, 10:47   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The record doesn't make any sense
Name:  Screen shot 2010-06-17 at 11.45.55.png
Views: 5817
Size:  31.0 KB

Name:  Screen shot 2010-06-17 at 11.47.02.png
Views: 5625
Size:  29.3 KB
Mark Gleeson is offline   Reply With Quote
Unread 17-06-2010, 11:05   #4
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

there was a warning of delays of 20-25 minutes to services due to "an incident beyond our control at monkstown" up on the screen at tara street last night..

Any chance the two are connected?

Last edited by ThomasJ : 17-06-2010 at 11:26.
ThomasJ is offline   Reply With Quote
Unread 17-06-2010, 11:37   #5
MugsGame
New to the board
 
Join Date: Jun 2010
Posts: 14
Default

Interesting. There was nothing about delays at Clontarf Rd. when I boarded the "Howth-bound" train at 8:12/8:13pm.
MugsGame is offline   Reply With Quote
Unread 17-06-2010, 13:16   #6
zag
Regular Poster
 
Join Date: Oct 2006
Posts: 199
Default

I was on a Southbound DART at Tara Street about 2020 last night when there was a totally inaudible platform announcement. A minute later there was an in-train announcement where the driver indicated there were going to be delays. You could tell from his wording that it sounded like this was a serious problem (person/train incident by the sounds of things) which wasn't going away any time soon so myself and a few others jumped off the train and went to get a bus instead. As we were walking down the platform the beeps went, the doors closed and he pulled out . . .

It still made sense to get the bus as the train was likely to be sitting somewhere south of Dublin as whatever problem it was got solved.

z
zag is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 22:31.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.