Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Luas Customer Service Issues > Luas Discussion
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 06-04-2012, 15:44   #1
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default Luas - revised timetables on the way

Revised timetables on the way as part of 1.5 million savings

http://www.dublinpeople.com/article.php?id=992&l=100
ThomasJ is offline   Reply With Quote
Unread 06-04-2012, 17:17   #2
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

http://www.luas.ie/change-to-service-april-2012.html
Quote:
Home | News Centre | News | Passenger Notice - Change to Service
Passenger Notice - Change to Service
06 April 2012

Change to Operating HoursPassengers are advised that from Monday April 16th 2012 there will be a new departure time for the last trams leaving Brides Glen (Green Line) Tallaght and Saggart Stops (Red Line).

There will be no change to the time of the last tram departures from the city centre outbound; St. Stephen’s Green and The Point.

There will also be some minor changes to frequency of trams on the Red and Green Lines too.

These changes reflect the difference in the numbers travelling outside of peak hours 7am to 7pm.

Red Line Passengers: Click here
Green Line Passengers: Click here

Should you require more information, contact Luas Customer Care:

Freephone: 1800 300 604
Email: info@luas.ie
Twitter: @Luas
__________________
Colm Moore is offline   Reply With Quote
Unread 06-04-2012, 20:46   #3
markpb
Member
 
Join Date: Dec 2005
Posts: 541
Default

I assume that the reduction in service will be primarily on the extensions since they're the under-performing sections?
markpb is offline   Reply With Quote
Unread 08-04-2012, 06:34   #4
on the move
Regular Poster
 
on the move's Avatar
 
Join Date: Feb 2009
Posts: 176
Default

€1,5 million is almost nothing in Luas terms, and is being stingy for the sake of it. Obviously, the ticket fare increases haven't being the solution to their issues.

My sympathy goes to the drivers who have been made scapegoats by the company. The oned I have spoken to in recent times have complained of crass scheduling, and low morale. I'm not surprised.

Sad that Tallaght and Saggart will lose services, but the whole schedule needs a complete overhaul for the present time.
__________________
"We'd like to apologise for..."
on the move is offline   Reply With Quote
Unread 08-04-2012, 12:36   #5
markpb
Member
 
Join Date: Dec 2005
Posts: 541
Default

Green line changes

Quote:
MONDAY – FRIDAY:
During the first hour of service, trams will run every 20 minutes (currently 15 minutes).
There will be a slight change (1 min) to the Morning/Day/Evening service.
Additional trams will run between 07:30 and 08:15 from Brides Glen to St. Stephen’s Green.

SATURDAY:
Until 9:00am, trams will run every 15 minutes (currently 12 minutes).
The night service will start at 9:30pm with a 15 minutes frequency (currently starts at 10:00pm with a 12 minutes frequency)

SUNDAY:
Until 10:30am, tram will run every 15 minutes (currently 12 minutes)
The night service will start at 9:00pm with a 15 minutes frequency (currently starts at 9:30pm with a 12 minutes frequency)
Red line changes

Quote:
MONDAY – FRIDAY:
During the first hour of service, there will be trams running every 20 minutes (currently 15 minutes).
There will be a slight change (+/- 1 min) to the Morning/Day/Evening service.

SATURDAY:
The first hour of service, there will be trams running every 20 minutes (currently 15 minutes).
Trams will then run:
- Every 12 minutes up to 10:30am (currently 10.5 minutes)

- Every 6 minutes from 10:30am to 7:00pm (currently 5 minutes)

- Every 12 minutes after 10:00pm (currently 10 minutes)

SUNDAY:
The first hour of service, there will be trams running every 20 minutes (currently 15 minutes).
All trams operating from Saggart to Belgard will be shuttle trams. Change at Belgard Interchange for onward travel.
markpb is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 18:29.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.