Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Limerick Ennis
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 01-12-2007, 10:56   #21
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

I think it's two-car 2700s most of the time.
Thomas Ralph is offline   Reply With Quote
Unread 14-01-2008, 18:55   #22
Tadhg17
Regular Poster
 
Tadhg17's Avatar
 
Join Date: Nov 2007
Posts: 49
Default

Quote:
Originally Posted by Mark Gleeson View Post
Single line section the whole way to Ennis means one every 2 hours is about as good as it gets, you then get a train every 2 hours to Limerick Junction to make the bi hourly connection to Dublin. There was talk of shipping logs to Waterford from Ennis, didn't happen since the line is too busy.

We have to wait to see what happens in Sixmilebridge even if they add a loop there ain't no trains to run the extra services
Are they going to add a loop at Sixmilebridge???

The last train leaving Ennis for Limerick leaves at 8:20pm midweek so I don't see why they could'nt use the line for moving logs after the last train. There is freight from the Tara Mines on the northern line late at night.
Tadhg17 is offline   Reply With Quote
Unread 14-01-2008, 19:06   #23
Tadhg17
Regular Poster
 
Tadhg17's Avatar
 
Join Date: Nov 2007
Posts: 49
Default

Quote:
Originally Posted by dowlingm View Post
What's the equipment used for Ennis services now? Have journey times improved any bit?
They use two 2700 railcars on the Limerick-Ennis railway line.

Journey times vary from 31mins -40mins. Often journeys are closer to the 31min mark. Other times it is closer to a 40min journey because the train has to wait for a few mins before entering a platform at Limerick station or sometimes when the gatekeepers at level crossings are a bit slow to close the gates like last week when the gatekeeper seemed to be asleep at the level crossing near LIT/Moyross and the train had to wait for 5mins til he finally closed the gates on the road.
Tadhg17 is offline   Reply With Quote
Unread 14-01-2008, 20:42   #24
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Quote:
Originally Posted by Tadhg17 View Post
Are they going to add a loop at Sixmilebridge???

The last train leaving Ennis for Limerick leaves at 8:20pm midweek so I don't see why they could'nt use the line for moving logs after the last train. There is freight from the Tara Mines on the northern line late at night.
You assume the line is open 24 hours day, its not its only open 5am - 9pm, exactly two shifts.
Mark Gleeson is offline   Reply With Quote
Unread 15-01-2008, 19:41   #25
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by Tadhg17 View Post
sometimes when the gatekeepers at level crossings are a bit slow to close the gates like last week when the gatekeeper seemed to be asleep at the level crossing near LIT/Moyross and the train had to wait for 5mins til he finally closed the gates on the road.
Somegates don't have a 'resident' gate keeper. I heard of one instance of a gate keeper going ahead of the Ennis train by car.
Colm Moore is offline   Reply With Quote
Unread 15-01-2008, 20:31   #26
Derek Wheeler
Registered user
 
Derek Wheeler's Avatar
 
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
Default

Quote:
Originally Posted by Victor View Post
Somegates don't have a 'resident' gate keeper. I heard of one instance of a gate keeper going ahead of the Ennis train by car.
The level crossing just over the shannon bridge is operated by a guy in a green van. On two seperate ocassions last year, I witnessed this.
Derek Wheeler is offline   Reply With Quote
Unread 16-01-2008, 22:57   #27
chris
Regular Poster
 
Join Date: Dec 2007
Location: Cambridge
Posts: 131
Default

Quote:
Originally Posted by Tadhg17 View Post
There is freight from the Tara Mines on the northern line late at night.
And look at the trouble that caused...
chris is offline   Reply With Quote
Unread 16-01-2008, 23:07   #28
Derek Wheeler
Registered user
 
Derek Wheeler's Avatar
 
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
Default

Quote:
Originally Posted by chris View Post
And look at the trouble that caused...


Yeah. No freight and no RPSI steam trains. They just feck up the network for the people who pay for it.
Derek Wheeler is offline   Reply With Quote
Unread 17-01-2008, 16:09   #29
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Quote:
They just feck up the network for the people who pay for it.
Well hold on now - freight doesn't get a subsidy remember!
dowlingm is offline   Reply With Quote
Unread 17-01-2008, 17:58   #30
Donal Quinn
Member
 
Join Date: Dec 2005
Posts: 267
Default

i heard first hand from a guy who was operating the gates at a crossing in the west of ireland in the nineties. he was in the town the next stop up the line and his lift home let him down. so he went to the station and got on the train which brought him to the gates which he then opened and the train went on its merry way!!! bless
__________________
It's the little things....
Donal Quinn is offline   Reply With Quote
Unread 17-01-2008, 21:38   #31
Derek Wheeler
Registered user
 
Derek Wheeler's Avatar
 
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
Default

Quote:
Originally Posted by dowlingm View Post
Well hold on now - freight doesn't get a subsidy remember!
And the tax payer still ends up paying for it.
Derek Wheeler is offline   Reply With Quote
Unread 28-01-2008, 20:40   #32
Tadhg17
Regular Poster
 
Tadhg17's Avatar
 
Join Date: Nov 2007
Posts: 49
Default

Quote:
Originally Posted by Derek Wheeler View Post
The level crossing just over the shannon bridge is operated by a guy in a green van. On two seperate ocassions last year, I witnessed this.
Thats interesting. Most of the time the train sails through the level crossing near the Shannon bridge/LIT. There are delays more often at the level crossing at the old Cratloe railway station and that gatekeeper is in residence there as far as I know.

Last edited by Tadhg17 : 28-01-2008 at 20:41. Reason: spelling mistake
Tadhg17 is offline   Reply With Quote
Unread 01-02-2009, 18:00   #33
Alan French
Member
 
Join Date: Dec 2008
Posts: 89
Default

Going back to Tadhg17's point (30-11-07), it is right and proper that some of the Ennis-Limerick Junction trains run through, without a change at Limerick, even though the timetable shows a change.

Having to change trains is a deterrent to passengers - ranking alongside poor timekeeping, bumpy rides, failed heating or bus replacement. OK, maybe it's not as bad as that, but you can't simply introduce a change where there used to be a through train, and assume there will be no loss of passengers. If, for genuine operating reasons, some trains require a change, let it apply to those trains only. Of course, all trains that operate through should be shown thus in the timetable.

It will be important when the the Western corridor opens, that some trains run through to Limerick Junction. This is because Galway-Cork was always seen as one of the main links, and to have two changes between Galway and Cork would be a serious deterrent. I have made the same point about Limerick-Waterford and Mallow-Tralee.
Alan French is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:51.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.