Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Longford-Maynooth-Dunboyne-Clonsilla-Dublin line
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 15-09-2016, 12:20   #21
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Quote:
Originally Posted by berneyarms View Post
Indeed but when the option is not to run them at all because there is insufficient money available to operate all of the commuter rolling stock, what do you expect to happen?
Thats true no doubt.

Tell you what though, I'm pretty sure a Dublin mayor would have provided a more compelling case for funds for Dublin transport than any of the last 3 transport ministers have done. FCC have alot to answer for in rejecting the proposal.
ThomasJ is offline   Reply With Quote
Unread 30-12-2017, 14:01   #22
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default Electrification and Navan rail

http://amp.irishexaminer.com/breakin...mpression=true
At last CIE are thinking of the future usually they only obstruct the development of rail transport. The piece mentions the wait for electrification , why the wait it’s obvious that it must happen given the oil situation and our failure to meet climate change goals that Ire signed up to. It’s now that the likes of the rail line to Navan should be opened and for a change put rail ahead of road building though I know that’s where the politician and the developer are on the same sheet. Electrify now and expand rail to airport and Navan.
Goods is offline   Reply With Quote
Unread 31-01-2019, 10:29   #23
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default Capacity Sligo line

Traveled on the early train to Dub on Maynooth line last week - very good service and used in big numbers. The train stopped all the way in to Dub so the time was over 2hrs. If the train had a last stop in Maynooth and then sped into Pearse station it would be a better service and those from the Longford / Mullingar distances would be more inclined to use it. Currently its a little too slow unlike the outward train which did not have first stop until Kilcock - much better!
Goods is offline   Reply With Quote
Unread 31-01-2019, 13:44   #24
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Goods: you say your journey was about 2 hours: from where to where? Sligo trains generally run from Maynooth to Connolly calling only at Drumcondra. A non-stop Maynooth to Pearse would make no sense whatsoever. What point are you trying to make?
ACustomer is offline   Reply With Quote
Unread 01-02-2019, 15:37   #25
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

The problem with running non-stop from Maynooth to Connolly is you can only go fast until you come up behind a commuter train as there are only two sets of tracks.

Maynooth to Pearse typically takes 50 minutes these days (if things are running on time). I'm sure it was 45 mins a few years ago.

Drogheda to Pearse generally takes 1hr 10mins. When I moved to Drogheda, most trains did it in an hour.

I would hope that electrification would help bring journey times down.
James Shields is offline   Reply With Quote
Unread 01-02-2019, 18:28   #26
James Howard
Really Really Regluar Poster
 
James Howard's Avatar
 
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
Default

Having a few morning Maynooth trains run non-stop between Clonsilla and Broombridge would make a bit of sense given that there is extra frequency there from Dunboyne. Definitely the Longford trains should do this as this would make it feasible to use ICRs for them. The journey is far too long for 29Ks.
James Howard is offline   Reply With Quote
Unread 02-02-2019, 09:46   #27
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default NTA quarterly performance reports

https://www.nationaltransport.ie/pub.../rail/reports/

Its interesting that when you go to the NTA site and look for the quarterly performance reports for 2018 only the first two quarters are shown. Performance of rail and the need to adjust where necessary is not happening if the reports are out of date and unpublished.
Goods is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 13:47.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.