Default Grand Canal Dock works

I know these are for the signalling upgrade and planned use of GCD as a terminus for Maynooth services, but they seem to be completely rebuilding the platform and trackbed on the 3rd platform - anyone know what the plan is?

GCD could really use better access from the street - I don't use the station myself but there seems to be serious congestion on the bridge everytime a train pulls in.
shweeney is offline   Reply With Quote
Unread 05-02-2015, 14:40   #2
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

Quote:
Originally Posted by shweeney View Post
I know these are for the signalling upgrade and planned use of GCD as a terminus for Maynooth services, but they seem to be completely rebuilding the platform and trackbed on the 3rd platform - anyone know what the plan is?

GCD could really use better access from the street - I don't use the station myself but there seems to be serious congestion on the bridge everytime a train pulls in.
The third (unused platform) will ultimately become the northbound through platform.

The existing northbound platform will become a turnback platform for terminating services.

There will have to be a remodelling of all the tracks in the area.
berneyarms is offline   Reply With Quote
Unread 17-07-2015, 10:22   #3
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

they've installed an extra bridge at GCD but it has gates on it and on the station side lands outside the ticket barriers - what is this for (a private access for Google similar to AIB's?)
shweeney is offline   Reply With Quote
Unread 17-07-2015, 16:37   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Asked Irish Rail twice, as of yet they have not gone on the record with an answer

Google is in no way involved.
Mark Gleeson is offline   Reply With Quote
Unread 19-10-2015, 11:04   #5
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

All very mysterious what's going on behind the hoarding at GCD. It looks likely that the exit barriers on the secondary exit are going to be relocated, possibly adjacent to the ones in the main station building (but that's just speculation on my part).

I've always thought that it would have made much more sense to put the station building at street level, with an underpass rather than a bridge, and ramps up to the platforms. But we'd have to go back to 2001 to find out what the designers were thinking.

James
James Shields is offline   Reply With Quote
Unread 19-10-2015, 12:53   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Good news I can confirm the second bridge will be opened for all passengers in coming months.

It was previously planned as an emergency bridge. The RSC confirmed to us that it will be opened to all passengers as part of the on going works
Mark Gleeson is offline   Reply With Quote
Unread 19-10-2015, 12:59   #7
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Even for Irish Rail, putting in a bridge and not letting people use it is an absurd idea. The congestion in the station if a northbound and southbound train arrive at the same time in the morning commute can be quite something.

James
James Shields is offline   Reply With Quote
Unread 20-10-2015, 08:33   #8
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Good news I can confirm the second bridge will be opened for all passengers in coming months.

It was previously planned as an emergency bridge. The RSC confirmed to us that it will be opened to all passengers as part of the on going works
Very odd that it would be planned as an emergency bridge. When the turnback facility is commissioned at Grand Canal Dock it will be very common for two trains to be dis-embarking on the island platform simultaneously. Assuming both trains drop a few hundred passengers there will be considerable conngestion even with both narrow footbridges operational. I suspect that an addutional exit will be required to the north onto Barrow Street.
Inniskeen is offline   Reply With Quote
Unread 20-10-2015, 11:09   #9
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

I've often wondered if it would be possible to have a second exit onto Grand Canal Quay/Clanwilliam Terrace. Could be tricky to fit one in.

James
James Shields is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:00.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.