Default 22000 trials between Waterford-Limerick J

According to IRN set 52 operated a return trial service between Waterford-Tipperary. Take it that means the route will become 22k if all clear given. It seems pointless putting them on the route. Is there any reason behind the move, hope to improve numbers by have better trains etc?
Jamie2k9 is offline   Reply With Quote
Unread 17-01-2013, 12:46   #2
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

22k's have been cleared to run that route within weeks of arriving and have operated services in the past so I don't see the point
Mark Gleeson is offline   Reply With Quote
Unread 17-01-2013, 17:26   #3
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Seems strange to run further trials though. It left Waterford at 07.20 and left Tip at 10.55 before joining the 13.00 to Heuston. Could the track works etc be a reason for retesting or might they just be considering higher speeds to improve times, the line should be capable as its all only a few years old. Now the 2800 could go faster if that was the reason.
Jamie2k9 is offline   Reply With Quote
Unread 17-01-2013, 18:03   #4
James Howard
Really Really Regluar Poster
 
James Howard's Avatar
 
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
Default

It is probably part of a cunning plan of transitioning towards a railway with no passengers. It is a lot easier if you don't have to be bothered about the self-loading freight.
James Howard is offline   Reply With Quote
Unread 18-01-2013, 07:46   #5
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
22k's have been cleared to run that route within weeks of arriving and have operated services in the past so I don't see the point
Very mysterious - perhaps they intend using 22ks from Monday and this was some sort of Health & Safety double check as it is probably some time since these units operated on the line. Alternately could have been a timing trial although this would be a bit pointless given that the new dis-improved service commences in a few days time.
Inniskeen is offline   Reply With Quote
Unread 18-01-2013, 12:05   #6
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Very mysterious - perhaps they intend using 22ks from Monday and this was some sort of Health & Safety double check as it is probably some time since these units operated on the line. Alternately could have been a timing trial although this would be a bit pointless given that the new dis-improved service commences in a few days time.
Since when have Irish Rail done things is a logical order...

From a cost point of view would it not make more sense to keep the 2800 on the route over an 22. Its more less a double in capacity.
Jamie2k9 is offline   Reply With Quote
Unread 18-01-2013, 19:32   #7
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Could it be that they want to replace the set with a 22 to have a single type in Waterford? Might offer some interesting economies in crewing, not to mention having the option to bustitute the Waterford-LJ some mornings if a Dublin-rostered 22 woke up on the wrong side of the bed.
dowlingm is offline   Reply With Quote
Unread 18-01-2013, 20:12   #8
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

No economy in crewing, all staff in Waterford are trained on 22k, 2800, 071, 201, some senior staff would hold drive anything privileges
Mark Gleeson is offline   Reply With Quote
Unread 18-01-2013, 21:43   #9
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Could it be that they want to replace the set with a 22 to have a single type in Waterford? Might offer some interesting economies in crewing, not to mention having the option to bustitute the Waterford-LJ some mornings if a Dublin-rostered 22 woke up on the wrong side of the bed.
That wouldn't be the reason don't you know if the 07.10 fails they don't bother with a bus transfer just move to the 07.40...
Jamie2k9 is offline   Reply With Quote
Unread 19-01-2013, 17:58   #10
doherty jack
Regular Poster
 
Join Date: Feb 2012
Location: Roscrea
Posts: 89
Default

the only reason for this transfer was just , if they did need a 22k to releif a 2800 etc , that they would be able to operate over the line . . .
doherty jack is offline   Reply With Quote
Unread 19-01-2013, 18:33   #11
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Quote:
Originally Posted by Mark Gleeson View Post
No economy in crewing, all staff in Waterford are trained on 22k, 2800, 071, 201, some senior staff would hold drive anything privileges
Fair enough. Given the now full inventory of 22s I thought it might be a possibility that having the 28 remote based was a relative inconvenience compared to a pool of 22s, especially since that 28 is now idle 1126-1625.
dowlingm is offline   Reply With Quote
Unread 27-04-2013, 12:35   #12
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

22 have operated a few passenger services on the route over the last while, today most recently however I believe the 07.20 on Saturdays is always very busy and having spare stock in Waterford makes possible as those 2800 don't have the capacity.
Jamie2k9 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 12:34.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.