27-12-2010, 18:10 | #21 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
Does it make a difference to the passenger experience? No it doesn't
For the record the DART has been metric, meters and kph since it opened. Strictly speaking DART trains don't need speed limit boards and colour light signals as its all displayed on a screen to the driver.
__________________
Unhappy with new timetable - let us know |
27-12-2010, 23:23 | #22 |
Member
Join Date: Jul 2009
Location: Limerick
Posts: 87
|
Why fix it when its not broken and all that. When Irish road speed limits changed from miles to kilometers it had null effect on rail.
|
27-12-2010, 23:34 | #23 |
New to the board
Join Date: Jan 2010
Location: Sandymount
Posts: 18
|
Imperial measurements generally are a completely out-dated format in this country, not just in terms of road signage but in any line of business. IR will eventually come round and change it, as within a generation people will simply not know what a mile is.
|
28-12-2010, 12:53 | #24 | |
Member
Join Date: Dec 2005
Location: Dublin
Posts: 707
|
Quote:
But that is somewhat off-topic for this thread. I seem to recall some years ago, having read that concrete sleepers require a deeper ballast bed than older wood sleepers. Given the array of low bridges on that stretch, it doesn't seem practical to use concrete sleepers on ballast. So I just answered my own earlier question. I would also wonder why the speed limit will be (probably) no higher than 30Mph? It will certainly be a welcome improvement over the crawling pace movement over the section at present, but still, you'd think with new rails etc it would be better. Any curves etc can't be that bad! |
|
28-12-2010, 12:55 | #25 |
Member
Join Date: Dec 2005
Location: Dublin
Posts: 707
|
One last question. When it said that the works were "to" the 3rd of January, do they mean exclusive or inclusive.
i.e. will services restart on the 3rd or the 4th? |
28-12-2010, 14:04 | #26 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
The first planned services are for the morning of the 4 January. Even if they finish early, its unlikely that there will be enough time to organise drivers and station staff. There would be a limited number of trains run before the in-service trains to ensure things have bedded down properly and tolerances checked.
The curve is tight enough - only a few hundred metres radius. Much tighter than Dalkey Tunnel or most of the curves in the city centre, save maybe Newcomen Curve. http://maps.google.com/maps?f=d&sour...,0.016544&z=16
__________________
|
28-12-2010, 14:13 | #27 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
The kph/mph situation is irrelevant and has no bearing on passenger experiences. If anyone has a problem with Irish Rail's use of imperial measurements they can take it up with the European Rail Agency. There will be no further discussion on this topic
The line is tightly curved hence the speed limit
__________________
Unhappy with new timetable - let us know |
30-12-2010, 20:38 | #28 |
Really Regular Poster
Join Date: Sep 2009
Posts: 258
|
Given the recent spate of appalling weather, Irish Rail are very lucky to have timed these works perfectly during a period of respite. There could have been delays for weeks if work had started but couldn't be completed on time due to poor weather.
|
30-12-2010, 22:14 | #29 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
If the track had been installed and maintained properly in the first place there would be no need for a closure in the first place.
__________________
Unhappy with new timetable - let us know |
31-12-2010, 00:12 | #30 |
Member
Join Date: Dec 2005
Location: Dublin
Posts: 707
|
Engaging in pure speculation here, but I don't know how they're going to reopen the line on the 4th.
Was down that way today and most of the deck track on the City bound line is still in-situ: they had only started trying to lift it this (Thursday) afternoon, and even then only at the very top of it at Dun Laoghaire's Southern turnout points. From what I could see the Southbound line had been lifted totally, but the replacement wooden sleepered line was only built for a short section below Dun Laoghaire, and for another very short section, laid but not yet welded. But the yellow road-rail vehicles were busy ferrying track panels from Glenageary to Dun Laoghaire, using the City bound line to lay new track on the Southbound line. |
31-12-2010, 01:00 | #31 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
They aren't doing the Dublin bound track at this stage, thats going to be held off until next Easter or Christmas. The plan was for only 1 track.
A short section of the Dublin bound approaching Dun Laoghaire is being done due to a set of points at that spot At at 1am all I can hear is the sound of drilling, deafening
__________________
Unhappy with new timetable - let us know |
03-01-2011, 13:54 | #32 |
New to the board
Join Date: Jan 2011
Posts: 10
|
Track due to reopen tomorrow morning info on Irish Rail website, looked over the low wall in Dun Laoghaire it looks good in fairness from up there!
|
03-01-2011, 15:44 | #33 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
Credit where credit is due: the PW people in IE generally finish projects on time and major posessions do not over-run. These are the people who also were at work at all hours in atrocious conditions keeping points clear of snow and in the recent big freeze. Well done.
|
03-01-2011, 18:03 | #34 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
I wouldn't be patting anyone on the back
The works were disorganized and the line could have been complete and open today. The rail safety commission will be interested in a set of photos we received which raise questions concerning safe work practice and standards The pace of work was amazingly slow, the southbound track was complete since effectively Saturday morning, but by Sunday evening not a single fishplate electrical bond had been bolted in
__________________
Unhappy with new timetable - let us know Last edited by Mark Gleeson : 03-01-2011 at 18:07. |
03-01-2011, 20:21 | #35 |
Member
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
|
Also, most of this work is done by contractor, not PW staff who would have been clearing points.
|
05-01-2011, 23:17 | #36 |
Member
Join Date: Dec 2005
Location: Dublin
Posts: 707
|
Took the train to South Dublin today, my first thoughts on the work done:
|
06-01-2011, 18:50 | #37 |
New to the board
Join Date: Jan 2011
Posts: 10
|
Mark works were undertaken on the southbound on the sunday saw a yellow tamper machine on there doing work on the track looked to be lifting it. Doubt that it could have been back any earlier they were also working on the northbound on the sunday in various spots -- not as extensive as the southbound but a similar effort. Can you post pictures you are on about on here or are they for public viewing?
|
07-01-2011, 11:14 | #38 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
There was a series of logistical screw ups which delayed track laying during the week. The track panels were not built based on a survey of the line so some had to be cut to size on site, fishplate holes drilled and in one case an insulated block joint had to be spliced in.
Track was laid from the Dun Laoghaire end instead of from Glasthule end. Ballasting was done manually instead of using hopper waggons An 8 series tamper can easily handle 1000m in an hour No work was done on Christmas day or St Stephen's day The gardai were called out several times to shutdown drilling at very early hours of the morning. Strangely drilling was silent for hours on end during the day. An investigation has been launched by the RSC into an alleged serious breech of the Rail Safety Act.
__________________
Unhappy with new timetable - let us know |
07-01-2011, 17:16 | #39 | |
New to the board
Join Date: Jan 2011
Posts: 10
|
Quote:
I was talking to an engineer mate of mine and he said; Your first Comment about panels being cut-- what about it? The plate holes woould have to be drilled on site for accuracy if they knew before hand they'd be cutting steel. From Myself What difference what end they started putting track in? Who says an 8 series tamper can handle 1000m in an hour? Is it the manufacturer? thet usually exaggerate what anything can do from a toaster to a Tamper! Agreed. No work done Xmas day or Stephens day-- Mayb to give the locals a quiet day or two before all the noise started or maybe they couldnt get contractors? Don't know about your last two comments Im sure the RSC will investigate thoroughly. Any hints as to what the alledged breech was?? Just a hint!!! |
|
10-01-2011, 21:58 | #40 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
I believe there was talk that the closure would require one or more movements over the South Wexford -did that happen?
|