anyone know when the new tracks will actually open? Can't see what the delay is to be honest, as it looks like they have just stopped work on it completely even though they still have to connect both ends. There looks to be quite a lot of plant hire sitting idol which I assume IE is paying for??
Kilkea is offline   Reply With Quote
Unread 13-07-2009, 15:42   #2
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by Kilkea View Post
anyone know when the new tracks will actually open?
It will be quite a few months yet.

Quote:
Can't see what the delay is to be honest, as it looks like they have just stopped work on it completely even though they still have to connect both ends.
Its quite possible that the small bits of work required to let everything else join up are still being done.

Quote:
There looks to be quite a lot of plant hire sitting idol which I assume IE is paying for??
Earthworks tend to be done by contractors, so it will be between the contractor and the plant hirer. many plant companies won't charge you if you declare the equipment "off hire".

There are more closures this weekend on Heuston-Portarlington, so maybe they will be doing work.
__________________
Colm Moore is offline   Reply With Quote
Unread 02-11-2009, 13:00   #3
Kilkea
Regular Poster
 
Join Date: Oct 2007
Location: Athy
Posts: 111
Default

This morning's 06.10 Waterford-Dublin train ran on the new tracks, although we were still inot Heuston late!
Kilkea is offline   Reply With Quote
Unread 29-11-2009, 00:03   #4
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default Update on Facebook

From www.facebook.com/iarnrodeireann

Question posted on facebook
Quote:
Just got the new time table for Kildare commuter line REALLY disappointed not one extra train stopping at Adamstown. Earliest train to Heuston Mon-Fri leaves Adamstown 07-04 hopeless. Sunday last train leaving Heuston for Adamstown 18.30 WTF........I thought when we had 4 tracking we would have more frequent services. .....Response please
Response by Irish Rail
Quote:
The completion of the Kildare Route Project delivers capacity which enables Iarnród Éireann to cater for growth into the future on Commuter and Intercity services. Currently, due to the national economic situation, demand levels have reduced, and development at areas along the line, including Adamstown, have not advanced to expected levels. However, current service levels are being maintained, and we will be able to respond with increased frequency swiftly when demand increases. In the meantime, upon completion of the two new lines, we are taking the opportunity to renew the track on the two existing lines on this intensively used section of the network. This work will be completed in 2010.

Last edited by Kilocharlie : 29-11-2009 at 00:06.
Kilocharlie is offline   Reply With Quote
Unread 30-11-2009, 22:22   #5
TGV
New to the board
 
Join Date: Nov 2009
Posts: 3
Default Kildare Route Project

Per Irish Rail Website...

The Kildare Route project will cost in excess of €350 million.

The new timetable has managed to reduce the number of trains. I wouldn't mind that if the remaining ones go faster.

Today I got the 5:10 to Athlone. It took one hour and 5 minutes to reach Kildare Town which is a full 30 minutes late on a supposedly 35 minute journey.

In these hard times, surely spending €350 million should lead to some improvement for customers, and if not then why spend the money in the first place?
TGV is offline   Reply With Quote
Unread 01-12-2009, 23:22   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Kildare route project isn't finished yet, until all 4 tracks are commissioned things are as they where. But when it is then the journey time reductions will come as will the end of delays due to all stop trains as you will glide by at 100mph on the fast track.

Current and final phase is relaying the old two tracks to modern standard, without significant impact on services, this would be impossible without the new tracks being in place

Good news if there is such is that EU law will mandate refunds for failure to achieve punctuality and reliability targets as of December 3rd 2009

Last edited by Mark Gleeson : 01-12-2009 at 23:27.
Mark Gleeson is offline   Reply With Quote
Unread 02-12-2009, 08:14   #7
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

I was told at the interconnector information session in Kilmainham last night that the 4 tracks would be open on 12th December.......

The bottleneck will move to the old Cherry Orchard then when 4 tracks have to go into 2 and the next section is apparently still only at the back of an envelope stage.
__________________
!
Oisin88 is offline   Reply With Quote
Unread 13-12-2009, 12:45   #8
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

4 track is now live as of about 10am this morning

However due track relaying there may only be 1 outbound track from time to time
Mark Gleeson is offline   Reply With Quote
Unread 30-01-2010, 13:40   #9
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

While some overtaking is taking place, for example the 0610 from Waterford regularly overtakes the 0720 from Portlaoise.

However the current ex-Heuston timetable does not take much advantage of the four tracking - perhaps they are waiting until the final down track relay is finished.

Example - the 0930 Galway is delayed by the 0915 to Portlaoise as it stops at Sallins and Newbridge; if the gap was reduced to 10 minutes, then the 0930 would have a clear run. The 1725 Limerick (non-stop Kildare) can get caught behind the 1715 to Newbridge.

In general if stopping trains were sent out 5-10 mins ahead of expresses then the expresses should have no problem overtaking.

So while there may be few new services in the near future until the recession is well and truly ended, there is scope for smoother operations in and out of Heuston with some journey time improvements.
Kilocharlie is offline   Reply With Quote
Unread 30-01-2010, 14:27   #10
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The timetable currently assumes that only a single track each way is available which is the case as the old tracks are to be relaid.

Slow trains would leave Heuston 5 minutes before a fast train to be overtaken at Adamstown
Mark Gleeson is offline   Reply With Quote
Unread 15-03-2010, 22:23   #11
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Noticed today that the down-fast track is now closed. Probably the beginning of the new track relay.
Kilocharlie is offline   Reply With Quote
Unread 15-03-2010, 22:36   #12
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

That figures it will be down to a single track outbound for the next 6 months or so.

Inbound retains both tracks
Mark Gleeson is offline   Reply With Quote
Unread 06-07-2010, 08:36   #13
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default Pointless overtaking

We now have the situation where the 0610 from Waterford regularly overtakes the 0720 from Portlaoise around Adamstown only to be held at Parkwest to allow the 0720 to enter Heuston first.

Today the 0610 stopped for nearly 10 minutes just outside Heuston while the 0720 slipped by....

Perhaps IE have decided trains will arrive in the sequece in the timetable?

So much for the benefits of the 4-tracking.
Kilocharlie is offline   Reply With Quote
Unread 21-07-2010, 07:21   #14
Kilkea
Regular Poster
 
Join Date: Oct 2007
Location: Athy
Posts: 111
Default

It looks like the new outbound fast track is nearly done, does this mean that they are going to replace the outbound stopping line next, or did they just need to relay the fast track?
Kilkea is offline   Reply With Quote
Unread 21-07-2010, 08:05   #15
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Both tracks are due to replacement. New rails for the down-slow have been dropped alongside. All trains will use the down-fast for several months.
Kilocharlie is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:49.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.