![]() |
![]() |
#38 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Charlemont situation is going to be very messy
The line will have to be 3m below road level and then rise to 5m above, so 8m, 1 in 25 give you 200m needed and since platforms have to be level all this happens after the stop, so going to result in one or more permanent local road closures. Some fairly ugly CPO here Note the alignment avoids the former Irish Nationwide building which of course is being knocked and rebuilt, of course it would have been so much easier to do the station and the building together... The tie in will require the demolition of the existing embankment so there won't be any Green line trams beyond Beechwood for a long time while this is done I have very little trust in the drawings they are very much draft, didn't see anyone out there taking core samples to investigate the ground conditions
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|