![]() |
|
|
Thread Tools | Search this Thread | Display Modes |
![]() |
#1 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Big picture:
* Has the revised track at GCD been done? * Where are we with the city-centre signalling system? * A fare matrix needs to be compiled and ticket machines programmed. * What rolling stock? * Passenger information systems need re-doing. Little picture: * Do all stations from Heuston to Kildare have validators? * Can the ticket machines at those stations sell / to-up Leap Cards? * Route maps need re-doing.
__________________
|
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|