03-12-2013, 09:01 | #1 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
DART Operations
Yesterday, problems at Bray, resulted in the 0600 and 0630 ex Greystones departing 14 and 9 minutes late respectively. The 0620 from Bray left 16 minutes late.
No attempt was made to modify the running of any of these trains and as a consequence there were significant, largely avoidable delays, to the 0730 & 0740 from Malahide and the 0745 ex Howth. There were also consequential delays to the 0735 to Belfast, 0650 from Belfast as well as the 0647 & 0800 from Drogheda. Oddly there was a DART in the quarry at Malahide from around 0715, yet the 0730 from Malahide didn't leave until 0743. (The DART in the quarry forms the 0740 from Malahide and followed the normal routine yesterday departing about 0750). Very poor operational management. |
Thread Tools | Search this Thread |
Display Modes | |
|
|