![]() |
![]() |
#10 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() The standard test set does include repeated door opening and closing. The trains under test are owned by the manufacturer and they pay.
The test is basically a shakedown to make sure everything is bolted down. A series of static tests is done first to confirm everything works.
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|