Unread 02-04-2016, 14:22   #161
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

Single C3K on 1235+1520 today
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 03-04-2016, 06:39   #162
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Timetable already considers the issue with the Dundalk train, its overtaken using the loop at Clongriffin
It didn't when I made the post !
Inniskeen is offline   Reply With Quote
Unread 04-04-2016, 08:25   #163
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

3 Enterprise sets have now entered revenue service. Set 3 entered service in recent days

Sets 1,3 are on Dublin Belfast, set 2 is now in Inchicore for training

April 10th timetable is going to happen
Mark Gleeson is offline   Reply With Quote
Unread 04-04-2016, 16:20   #164
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

It may be going to happen but it is somewhat of a work of fiction as much of what is scheduled is a nonsense. I imagine it is going ahead to save the embarassment of going to NIR and telling them that the whole thing is unnecessary !

The only change that needs to be made is to re-instate the 2005 from Belfast. Everything else is of no benefit to anybody and requires a series of further changes which have yet to dawn on Irish Rail.
Inniskeen is offline   Reply With Quote
Unread 05-04-2016, 07:23   #165
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

From the Irish Rail web site !
Belfast Enterprise schedule changes from 10th April. DART and other Connolly routes unchanged

30 March 2016

Planned changes to DART and other Connolly routes will not proceed.

Iarnród Éireann advises customers that planned changes to DART and other Connolly routes planned from 10th April will not proceed, with the exception of some minor changes to Belfast Enterprise services.

In summary:

DART services will continue to operate to their current schedule. Additional capacity will be provided at peak times in response to demand.
Maynooth / M3 Parkway, Sligo, Rosslare Europort and Drogheda/Dundalk Commuter (excluding departure times to Enterprise trains - see below) services will remain unchanged.
Belfast Enterprise services will see some minor changes from 10th April. Customers are advised to check times before travel.
Full information is available through the journey planner above and through our timetables section.

What does the word unchanged mean in "DART and other Connolly routes unchanged" - clearly not what is says as there are changes advised in the journey planner and others that will have to be made in short order !
Inniskeen is offline   Reply With Quote
Unread 06-04-2016, 15:51   #166
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

Railcar on 1520 and 1810. DD seems to have failed in Dublin as no report of problem with 1235 ex Belfast
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 06-04-2016, 17:26   #167
Padna
Regular Poster
 
Join Date: Jan 2008
Posts: 69
Default

Currently on the 1805 southbound from Belfast and it's an Enterprise.
Padna is offline   Reply With Quote
Unread 06-04-2016, 17:33   #168
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

The (obviously false) information was from the translink train status page which has since been deleted
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 13-04-2016, 06:49   #169
Padna
Regular Poster
 
Join Date: Jan 2008
Posts: 69
Default

0645 southbound is stopped on the line just south of Portadown this morning. Due to a 'train fault' according to Translink's Twitter feed.
Padna is offline   Reply With Quote
Unread 13-04-2016, 06:55   #170
Padna
Regular Poster
 
Join Date: Jan 2008
Posts: 69
Default

Believe there's also a problem with the 0735 northbound. Not good when neither of the early morning services will reach its destination on time!
Padna is offline   Reply With Quote
Unread 13-04-2016, 09:19   #171
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Second day in a row for the 0735 !

1850 Belfast every evening due to defective timetable, taking almost 70 minutes to reach Dundalk - a complete farce, it appears any old rubbish seems acceptable and IR will resist re-instating previous departure time or more logically moving departure to 1905 which would save about twenty minutes on the current insulting performance.

Surprise, Surprise, the 0645 from Belfast has not reached Dublin on time once so far this week despite reasonably punctual departures from Drogheda on Monday and Tuesday.
Inniskeen is offline   Reply With Quote
Unread 13-04-2016, 09:40   #172
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

7:35 arrived in Drogheda about 8:25. First time I've seen refurbished Enterprise stock on that train.

6:45 from Belfast arrived in Drogheda 15 mins late at 8:35, and got to Dublin at 9:15.

On an unrelated note, the Enterprise liveried locos have a fancy swoosh that lines up with the coach livery. I wonder how long they'll manage to keep the swooshes facing the right way?

James
James Shields is offline   Reply With Quote
Unread 13-04-2016, 11:08   #173
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The locomotives will only work one way around as they only have the MMI socket on the Dublin end. Sure the train can move without MMI

By default the Enterprise locomotives have been the correct way around since the DD's arrived. If a loco is the wrong way around it will be turned at Belfast Great Victoria Street or unlikely but possible at Kilkenny or Limerick Junction

The cab in 206/7/8/9 is actually bigger on the Belfast end
Mark Gleeson is offline   Reply With Quote
Unread 13-04-2016, 21:04   #174
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

Quote:
Originally Posted by Padna View Post
Believe there's also a problem with the 0735 northbound. Not good when neither of the early morning services will reach its destination on time!
Don't know what happened today but yesterday 0735 was failed before departure and an ICR replaced it
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 14-04-2016, 10:11   #175
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

0650 ex Belfast failed on arrival in Dublin this morning. 0800 ex Belfast formed 0935 departing 50 late
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 14-04-2016, 11:05   #176
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Does anyone know what the real problem is with the DD refurbishment?

The refurbished sets seem (according to reports on this site) to be failing practically every day. Is this just "teething" problems, or has the whole project been done incompetently?

I am inclined to think that there is deep incompetence at work: the project has been way over time, and Inchicore had to lend a hand with a few coaches.

I wonder if we will be told if it's over budget as well. In which case watch out for some other work, such as badly needed per way work, to be postponed in order to free up the funds.

Just wondering, but the whole thing looks a right mess.
ACustomer is offline   Reply With Quote
Unread 14-04-2016, 14:28   #177
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

well, they certainly haven't had the same run in time off service that was given to either the 22K or the Mark 4's (and if i am right the refurbished original DARTS) so this sort of thing will happen.
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Unread 14-04-2016, 15:16   #178
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
well, they certainly haven't had the same run in time off service that was given to either the 22K or the Mark 4's (and if i am right the refurbished original DARTS) so this sort of thing will happen.
That's by choice not requirement, so it's not a excuse they can even think about using as there was noting stopping them carrying out lots of test runs.

This is worse than HEP ops
Jamie2k9 is offline   Reply With Quote
Unread 14-04-2016, 15:52   #179
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

thats my point.

it did take an extraordinary amount of time to get the Mark 3 gen vans done. dont forget there was an idea floating about (in fact an aim) to have hourly enterprises with a mixture of DD+mark3 gen vans and refurbished mark3 sets.

i guess it was just beyond them.
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Unread 14-04-2016, 15:57   #180
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Quote:
Originally Posted by Thomas J Stamp View Post
i guess it was just beyond them.
Beyond their funding, anyway.

Is there funding available for hourly Enterprise? If there was, do the Mk3 sets still exist?
James Shields is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 14:20.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.