![]() |
|
![]() |
#1 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() http://www.irishrail.ie/limerickworks
Quote:
|
|
![]() |
![]() |
![]() |
#2 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() This is a lot of disruption given that the layout is now relatively simple, the points have already been renewed and presumably wired back to a location that they can be easily connected to the new system. Are they totally renewing the track and re-building the platforms as well ?
|
![]() |
![]() |
![]() |
#3 | ||
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Quote:
Quote:
|
||
![]() |
![]() |
![]() |
#4 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() This is a lot of disruption given that the layout is now relatively simple, the points have already been renewed and presumably wired back to a location that they can be easily connected to the new system. Are they totally renewing the track and re-building the platforms as well ?
|
![]() |
![]() |
![]() |
#5 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Yes
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#6 | |
New to the board
Join Date: May 2017
Posts: 1
|
![]() Quote:
Last edited by Agron : 19-10-2021 at 13:22. |
|
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|