![]() |
|
![]() |
|
Thread Tools | Search this Thread | Display Modes |
|
![]() |
#1 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.met.ie/forecasts/
Quote:
Based on Monday's floods, there are specific risks to the following areas.
__________________
|
|
![]() |
![]() |
![]() |
#2 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() Luckily enough, I'm not on the train today but a summary of Irish Rail's twitter feed is pretty typical of Irish Rail. In 20 minutes, delays have gone from 20-30 minutes to 30-60 minutes.
Delays now 30-60 mins on DART, Maynooth, Northern, apologies, and thank you for your patience |
![]() |
![]() |
![]() |
#3 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() Looks as if Irish Rail need to urgently revise their contingency plans during periods of significant signalling disruption. It is clear that DART operations are not compatible with other than minor signal failures as typically such failures render coded signals inoperative resulting in DART movements being restricted to a maximum running speed of about 10 mph.
While such working over short sections (say between two signals) may be practical, DARTs crawling along at 10 mph over lengthy sections of line simply collapses the DART service and massively delays other services. Yet another operational disaster for Irish Rail with attendant misery for their customers. |
![]() |
![]() |
![]() |
#4 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Given the scale of difficulties two stations closed due flooding major flooding near Glenageary and the odd tree falling to provide any service is something
Given Dart carries way more people it is entitled to priority. There was probably a lot of pass signal xx at danger this morning. Given the slow speeds at Connolly a coded circuit failure is not going to be that bad. Having to run single line due to equipment damage is the real problem
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#5 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() Quote:
"Reduced speed primarily at Serpentine crossing near Sandymount; Harmonstown; Broombridge. DART/Commuter will operate with 5-10 min delay" In reality the delays were catastrophic. This is not to criticise train crews, signal maintainers and others who were faced with horrific conditions in getting to work. I am criticising the fact that Irish Rail do not appear to be able to reliably evaluate the likely effect on services of operating constraints. This is a recurrent theme especially in respect of DART operations which are especially sensitive to disruptions to the signalling system. As regards DART being entitled to priority based on numbers carried - this is a dubious argument given that 1) average DART journeys are very short (around 9km, I believe), 2) DART usage is similar or less than combined northern and western commuter service usage and 3) average peak loading per DART path is less than average northern or western commuter usage. DART is now so slow that even on a good day the service is essentially incompatible with even modestly competitive longer distance commuter and intercity services on the northern line beyond Howth Junction - this issue is one of the major reasons for the flight away from the railway along the northern corridor and the deep scepticism about future investment, particularly the ill conceived Clongriffin to Dublin Airport scheme. Last edited by Inniskeen : 25-10-2011 at 10:53. |
|
![]() |
![]() |
![]() |
#6 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() DART carries 17 million per annum which is more than twice the sum of Northern and Maynooth usage
There is flooding (Serpentine Ave is a known problem location). All routes are running Compare to Luas which has just given up between Balally and City because they have no redundancy in there power supply
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#7 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://irishrail.ie/news_centre/travel_alerts.asp?action=view&news_id=1225
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#8 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.luas.ie/travel-updates/
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#9 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://irishrail.ie/news_centre/travel_alerts.asp?action=view&news_id=1225
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#10 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.met.ie/forecasts/
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#11 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://irishrail.ie/news_centre/travel_alerts.asp?action=view&news_id=1225
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#12 | |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() Major disruption due to major signalling fault as a result of flooding at howth junction
Quote:
|
|
![]() |
![]() |
![]() |
#13 | |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() update
Quote:
|
|
![]() |
![]() |
![]() |
#14 |
Really Regular Poster
Join Date: Dec 2005
Posts: 431
|
![]() Any idea's what time this started impacting services? Seemingly large number of passengers to be sent back into Connolly. As someone who got what I believe was the last northbound Drogheda train last night (18.40), and was delayed by 1 hour between Howth Junction and Donabate, my heart goes out to them.
Must be very serious to impact so many travellers.
__________________
![]() |
![]() |
![]() |
![]() |
#15 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() i'm not sure, a guy i work with was notified of this at 18:30. apparently his partner was stuck on a train for an hour and a half and were then told to get off the train.
|
![]() |
![]() |
![]() |
#16 |
Really Regular Poster
Join Date: Dec 2005
Posts: 431
|
![]() Just had an unconfirmed report from someone who got a Northern suburban train at 17.00 approx. that they still are stuck north of Connolly(19.30), and have yet to make it back to Connolly - 2 and 1/2 hours later. I'd have to question if that is correct, as that seems extreme.
__________________
![]() |
![]() |
![]() |
![]() |
#17 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://irishrail.ie/news_centre/travel_alerts.asp?action=view&news_id=1225
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#18 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Green Line closed. Limited bus replacement service.
http://www.luas.ie/travel-updates/ Quote:
__________________
|
|
![]() |
![]() |
![]() |
#19 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.dublinbus.ie/en/News-Cent...us-Diversions/
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#20 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Green Line closed. Substitute bus service.
http://www.luas.ie/travel-updates/ Quote:
__________________
|
|
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|