|
05-09-2009, 16:21 | #1 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
Removing railcars from Clonsilla-Docklands Services
I'm wondering if it woukld be possible to remove railcars from Clonsilla-Docklands services and replacing them with Mark 3 Push-Pull sets.
That means the railcars currently used on this service could be used on Maynooth-Connolly services. Or, if as is expected, servicing of railcars becomes a problem if they are away from Drogheda for too long, some of the old rolling stock will need to be pressed into use anyway.
__________________
|
05-09-2009, 16:26 | #2 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
Im not sure there is a problem with stock.
Did someone not report that there is a surplus of commuter railcars south of the boyne? I dont think there is a need for any non-railcar sets on the maynooth line. They take up too much time and effort. |
05-09-2009, 16:37 | #3 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
But it would be nice to have all trains as 6- or 8-car instead of some 4-car.
__________________
|
05-09-2009, 20:13 | #4 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
Best thing would be to go to 2 car operation, the demand isn't there and even at 2 car it would be far from uncomfortable, that would free resources to elsewhere
__________________
Unhappy with new timetable - let us know |
05-09-2009, 21:11 | #5 |
Member
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
|
I think the Docklands service is more or less perfect as it is,it only uses 2 29000 sets to run and is always well-patronised at peak times.
|
06-09-2009, 10:13 | #6 |
IT Officer
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
|
2-car operation would probably delay things too much as people walk up or down the platform to get to the train = +90 seconds at each stop.
|
Thread Tools | Search this Thread |
Display Modes | |
|
|