Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > General Irish Rail Discussion
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Unread 15-08-2009, 19:59   #1
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default Wishlist for upcoming timetable

Just thought it might be an idea for people to put up what they would like to see in the new timetable without any technical aspects or anything that would need a miracle to do!
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 20:24   #2
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default Maynooth and longford line

There are a couple of things I would like to see on the Maynooth/longford line:

-7 day clockface timetable: I want to be able to know the timetable without having to refer to a timetable.

-Later train: would like to see the 23:10hrs pushed back to 23:30hrs

-21:55hrs pearse maynooth, i have missed this train a couple of times if it had let pearse at ten i would have made it!

-later sunday service 2230 from pearse should be the last on a sunday

-should be a 21:00hrs pearse mullingar service

anything else?
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 21:10   #3
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

Simple things:
(1) As much clockface as possible
(2) Cut the padding
(3) Consistency, not 3 trains within an hour and then a 3 hour break.
__________________
!
Oisin88 is offline   Reply With Quote
Unread 15-08-2009, 21:55   #4
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

D
Quote:
Originally Posted by Oisin88 View Post
Simple things:
(1) As much clockface as possible
(2) Cut the padding
(3) Consistency, not 3 trains within an hour and then a 3 hour break.
Agreed, example would be longford

With 17:05 and 17:15 then 18:05 and 18:18. Speead them out!
Agreed
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 21:22   #5
KSW
Really Regular Poster
 
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
Default Rosslare/Dublin

What I do would like for the Rosslare line is clockface something that I can remember in pattern in both directions.

-A later train home from Connolly leaving at 19.30 to Rosslare serving Tara St,Pearse,Dun Laoghaire even Kilcoole then going as fast as the tracks will glide the train to the following stations until it reaches Rosslare.

-New trains, IE for example putting a 4coach 29k on the new proposed 13.30 find another 22k train

-Faster train times

-Try to give just that much top priority between Bray & Connolly

Do these simple things and you will have at least one passenger happy....
KSW is offline   Reply With Quote
Unread 15-08-2009, 21:35   #6
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Quote:
Originally Posted by KSW View Post
What I do would like for the Rosslare line is clockface something that I can remember in pattern in both directions.

-A later train home from Connolly leaving at 19.30 to Rosslare serving Tara St,Pearse,Dun Laoghaire even Kilcoole then going as fast as the tracks will glide the train to the following stations until it reaches Rosslare.

-New trains, IE for example putting a 4coach 29k on the new proposed 13.30 find another 22k train

-Faster train times

-Try to give just that much top priority between Bray & Connolly

Do these simple things and you will have at least one passenger happy....
When you say 13.30 keith do you mean the new service do you mean the train to arklow? I presume that will be a six coach 28k because it will be running back to maynooth.
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 21:58   #7
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Quote:
Originally Posted by ThomasJ View Post
When you say 13.30 keith do you mean the new service do you mean the train to arklow? I presume that will be a six coach 28k because it will be running back to maynooth.
One other example for gorey would be connection with the other lines especially on a sunday!
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 22:02   #8
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default Any northern line folk here?

Two things that sping to mind:

- a better service than every 2 hours on a sunday during the day

-the 22:30ish should run on a saturday night
ThomasJ is offline   Reply With Quote
Unread 15-08-2009, 23:34   #9
KSW
Really Regular Poster
 
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
Default

Quote:
Originally Posted by ThomasJ View Post
When you say 13.30 keith do you mean the new service do you mean the train to arklow? I presume that will be a six coach 28k because it will be running back to maynooth.
I mean the proposed 13.30 from Connolly to Rosslare. I think you meant the proposed 12.05 to Arklow that will be a 6car 28k..
KSW is offline   Reply With Quote
Unread 16-08-2009, 00:00   #10
karlr42
Member
 
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
Default

If every train was an 8-car set between 4pm and 7pm(I realise this is entirely impossible), I'd be very happy.
Other than that, just consistency, so there are no more huge gaps and short bursts.
karlr42 is offline   Reply With Quote
Unread 17-08-2009, 22:53   #11
sublimity
Really Regular Poster
 
Join Date: Jan 2008
Location: Dublin
Posts: 309
Default

Quote:
Originally Posted by KSW View Post
What I do would like for the Rosslare line is clockface something that I can remember in pattern in both directions.

-A later train home from Connolly leaving at 19.30 to Rosslare serving Tara St,Pearse,Dun Laoghaire even Kilcoole then going as fast as the tracks will glide the train to the following stations until it reaches Rosslare.

-New trains, IE for example putting a 4coach 29k on the new proposed 13.30 find another 22k train

-Faster train times

-Try to give just that much top priority between Bray & Connolly

Do these simple things and you will have at least one passenger happy....
Agreed. New trains to take over completely from September 27th.

We will also need 6 coach 22k very soon. 2800/29000 trains to be a thing of the past on the rosslare line, with only the odd one for Gorey services being acceptable.
sublimity is offline   Reply With Quote
Unread 17-08-2009, 23:31   #12
KSW
Really Regular Poster
 
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
Default

Quote:
Originally Posted by sublimity View Post
Agreed. New trains to take over completely from September 27th. We will also need 6 coach 22k very soon. 2800/29000 trains to be a thing of the past on the rosslare line, with only the odd one for Gorey services being acceptable.
We will also need 6 coach 22k very soon
Agreed , The 13.05 service seems to be full every Tuesday - Hopefully people will more and more use the new trains making IE use 3x2, 22k car sets ... Take the smartness out of the company....

How many bets are on the 27th that the news trains may not operate on all services and not just the odd one
KSW is offline   Reply With Quote
Unread 17-08-2009, 23:42   #13
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Quote:
Originally Posted by KSW View Post
How many bets are on the 27th that the news trains may not operate on all services and not just the odd one
Highly unlikely! Unless IE feel they will be able to cope with 3-coach 22ks on all services which i doubt, one of the evening peaks will be 6-coach 2800

Based on the "reported" new timetable the 16:30hrs (from maynooth) will be six-coach 2800 with the 17:30hrs and 18:30hrs being 3-coach 22k! that cant be right!

Untill SDO is sorted (not for a good while- still out to tender?) six-coach 22ks cant operate on the rosslare line!
ThomasJ is offline   Reply With Quote
Unread 18-08-2009, 08:43   #14
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

Quote:
Originally Posted by sublimity View Post
Agreed. New trains to take over completely from September 27th.

We will also need 6 coach 22k very soon. 2800/29000 trains to be a thing of the past on the rosslare line, with only the odd one for Gorey services being acceptable.
6-coach 22K is still not going to happen on the Rosslare line until the selective door opening issues are resolved. A 6-coach 22K is longer than the platforms at Rathdrum and Enniscorthy, and possibly Arklow as well.
Thomas Ralph is offline   Reply With Quote
Unread 18-08-2009, 08:43   #15
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

And then I read ThomasJ's post. Great Thomases think alike, eh?
Thomas Ralph is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 12:14.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.