Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Longford-Maynooth-Dunboyne-Clonsilla-Dublin line
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Unread 26-01-2013, 18:09   #1
drouse
New to the board
 
Join Date: Aug 2011
Posts: 19
Default Pelletstown (D7/15) station PP application

DUBLIN CITY COUNCIL

We Iarnród Éireann Intend to apply for: PERMISSION for development at this site: Pelletstown, Royal Canal Avenue, Dublin 7.

The development will consist of: Construction of a new railway station incorporating, 2no 174m long x 3m wide passenger platforms either side of the Sligo to Dublin railway line.

A footbridge spanning the railway connecting the proposed platforms, with 2no staircases and 2no ramps of a gradient of 1:20.

Platforms to incorporate, lighting, CCTV, ticket vending machines, railings, seating, shelters, commercial advertising, driver operating monitors, public address, customer information signs, directional and station signage.

Construction of a footbridge over the Royal Canal to provide access from Royal Canal Avenue.

Construction of stepped and ramped access from Ashington Park.

Installation of street lighting to footpaths extending from the proposed access at Ashington Park.

Clearing of existing vegetation between the park and the railway. Partial demolition of the existing boundary wall and installation of new sections of boundary wall at the ends of the platform. Landscaping between the park and the rear of the proposed new platform.

Installation of a dedicated pedestrian and cycle path across the park including disabled parking bays at Ashington Park.

Installation of street lighting to bridge over the Royal Canal as well as the immediate vicinity of Royal Canal Avenue where required.

Partial demolition of the existing boundary fence along the canal and installation of new sections of boundary fencing at the ends of the platform.

Landscaping between the canal and the rear of the proposed new platform. Installation of an ESB kiosk at Royal Canal Avenue. Construction of a Telecoms Equipment Room at the eastern end of the proposed platforms with access road from Ratoath Road.

The total works involved cover an area of approx. 2200 sq m of plan area, and approx 20 linear meters of street frontage.

The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the Offices of Dublin City Council during its public opening hours and a submission or observation in relation to the application may be made to the Authority in writing on payment of a prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application.

Posted: 24/01/2013
drouse is offline   Reply With Quote
Unread 26-01-2013, 21:32   #2
karlr42
Member
 
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
Default

Given that money has not been made available yet for the road overbridge in the vicinity, what are the chances of the money for this actually being stumped up any time soon?
karlr42 is offline   Reply With Quote
Unread 29-01-2013, 16:16   #3
eugene
Member
 
Join Date: Dec 2005
Posts: 132
Default

Update on Reillys Bridge here..

http://www.neighbours.ie/forums/show...rossing-update
eugene is offline   Reply With Quote
Unread 02-02-2013, 20:23   #4
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Planning Application Reference: 2109/13 Documents not available on-line yet.

http://www.dublincity.ie/swiftlg/apa...esults%3C/a%3E
Quote:
Full Development Description

Construction of a new railway station incorporating, 2no 174m long x 3m wide passenger platforms either side of the Sligo to Dublin railway line. A footbridge spanning the railway connecting the proposed platforms, with 2no staircases and 2no ramps of a gradient of 1:20. Platforms to incorporate lighting, CCTV, ticket vending machines, railings, seatings, shelters, commercial advertising, driver operating monitors, public address, customer information signs, directional and station signage. Construction of a footbridge over the Royal Canal to provide access from Royal Canal Avenue. Construction of stepped and ramped access from Ashington Park. Installation of street lighting to footpaths extending from the proposed access at Ashington Park. Clearing of existing vegetation between the park and the railway. Partial demolition of the existing boundary wall and installation of new sections of boundary wall at the ends of the platform. Landscaping between the park and the rear of the proposed new platform. Installation of a dedicated pedestrian and cycle path across the park including disabled parking bays at Ashington Park. Installation of street lighting to bridge over the Royal Canal as well as the immediate vicinity of Royal Canal Avenue where required. Partial demolition of the existing boundary fence along the canal and installation of new sections of boundary fencing at the ends of the platform. Landscaping between the canal and the rear of the proposed new platform. Installation of an ESB kiosk at Royal Canal Avenue. Construction of a Telecoms Equipment room at the eastern end of the proposed platforms with access road from Ratoath Road. The total works involved cover an area of approx. 2200 sqm of plan area, and approx 20 linear metres of street frontage.
__________________
Colm Moore is offline   Reply With Quote
Unread 02-02-2013, 22:35   #5
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

What's the source of funds for this project?
dowlingm is offline   Reply With Quote
Unread 14-02-2013, 22:36   #6
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

The drawings still aren't on-line, so I took a look at them in the council offices today.

This should give the general layout: http://www.dublincity.ie/LocationPub...tureid=2109/13 You may need to click on the "thumb tack" icon on the left hand side.

Essentially, it is an unmanned station, with ticket barriers. Two platforms, a bridge and steps and long ramps to the bridge. There is a second bridge across the canal and a footpath/cyclepath from Ashington Avenue to the south entrance to the station. It will be about 1km from Ashtown and Broombridge stations and a few hundred metres west of Reilly's Bridge. The footbridge will be public - it will reduce the walking/cycling distance from Ashington Park to Royal Canal Park, Dublin Industrial Estate and Finglas by approximately 3km.

Approximate location of proposed bridge over canal: https://maps.google.ie/maps?q=Ashing...,183.4,,0,4.75

Approximate location of start of footpath/cyclepath from Ashington Avenue to the south entrance to the station: https://maps.google.ie/maps?q=Ashing...51. 27,,0,6.3

Concerns would be that:
* It will be unmanned and indeed unmannable - the fear it would turn into another Broombridge.
* It makes no attempt to join with Dublin Bus routes 120 or 122.
* The entrance to the south is across parkland for 150 metres.
* I'm not certain the ramps 'work'.
* The entrance to the north is relatively undeveloped.
__________________

Last edited by Colm Moore : 14-02-2013 at 22:39.
Colm Moore is offline   Reply With Quote
Unread 14-02-2013, 23:22   #7
karlr42
Member
 
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
Default

Looks like that might generate a bunch of resident objections from within , can't say I blame them.

Why is it unmannable? No room for a station building? I agree that's definitely a problem given the area.

Also, it's kind of a shame, this will slow down trains a lot, it's placed on one of the few stretches of track between Clonsilla and Connolly where trains reach a decent speed.

Last edited by karlr42 : 14-02-2013 at 23:27.
karlr42 is offline   Reply With Quote
Unread 15-02-2013, 11:13   #8
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by karlr42 View Post
Why is it unmannable? No room for a station building?
There is room for a station building. They just aren't proposing one.
__________________
Colm Moore is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 05:13.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.