|
09-09-2011, 14:28 | #1 |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
[09/09/2100] 14.01 Gorey to Dublin ex Rosslare
Train delayed at greystones,line between bray and greystones is suspended. The arklow may pith train has just pulled in beside us here in greystones,
How long do are meant go wait!!! Just get that person of the line |
09-09-2011, 14:43 | #2 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
The line is closed as of 14:45
The signaling records show the line is clear, so not a broken down train by extension if there is no train there is no train vs person. Most likely some form of rockfall. Given the Rosslare line trains are held at Greystones its not a overhead line power failure 14:30 Greystones Malahide operated as normal 13:30 Malahide Greystones terminated at Bray 15:00 Greystones Malahide started from Bray
__________________
Unhappy with new timetable - let us know |
09-09-2011, 14:58 | #3 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
there is an unconfirmed report on twitter of a barrier put down on the line between bray and greystones. May or may not be true,
|
09-09-2011, 15:04 | #4 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
irish rail twitter saying services back running
|
09-09-2011, 15:12 | #5 |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
Arriving at bray now
|
Thread Tools | Search this Thread |
Display Modes | |
|
|