#1 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Remind me why trams can't operate The Point-Connolly. If they can do it out of service, why not in service?
__________________
|
![]() |
![]() |
![]() |
#2 |
Regular Poster
Join Date: Feb 2009
Posts: 176
|
![]() Trams can't get to/from Red Cow HQ.
Given where the incident is, it looks like the service could run Citywest/Tallaght-Heuston. Why it isn't is unknown.
__________________
"We'd like to apologise for..." |
![]() |
![]() |
![]() |
#3 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() The track layout doesn't allow eastbound trams turn back at Heuston towards Saggart and Tallaght. Somewhat of a design flaw !
The location of electrical disconnects may also be a factor. Seems no reason why services couldn't operate from the Point to Connolly and vice-versa. Both the track layout and electrical sections permit this. Indeed the service could probably run to Abbey Street although the lack of an eastbound signal towards Connolly might complicate matters somewhat. |
![]() |
![]() |
![]() |
#4 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Sadly the signalling arrangements at Connolly do not currently allow a shuttle to from the Point
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#5 | |
Member
Join Date: Oct 2006
Posts: 395
|
![]() Quote:
Trams can turn back at Abbey st and Smithfield but there are no obvious signals near the switches. Does the driver operate them manually? |
|
![]() |
![]() |
![]() |
#6 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() Quote:
Didn't realise the Connolly area wasn't signalled for movements to/from the Point |
|
![]() |
![]() |
![]() |
#7 |
Member
Join Date: Feb 2009
Posts: 46
|
![]() So they went to trouble of putting in track to allow Connolly to The Point shuttles but didn't put in the required signals so the track could be used? That's sounds a bit of a waste
|
![]() |
![]() |
![]() |
#8 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() You can do Tallaght - Connolly - Point but you can't do the reverse
Apparently an upgrade is planned. Its typical of the poor thought in much of the Luas design, no thought in the design for how to cope with partial closures
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#9 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() DART isn't much better with a dis-functional layout at Malahide, a half-baked layout yet to be commissioned at Clongriffin and the recent removal of crossovers at Merrion and Dun Laoghaire.
|
![]() |
![]() |
![]() |
#10 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() The DART has massive redundancy compared to Luas, reversible signaling between Howth Junc and Dun Laoghaire (been wrong way numerous times) plus dual power feeds for all substations.
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#11 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Buildings have been partially demolished: http://www.luas.ie/assets/graphics/R...igns/photo.JPG
__________________
|
![]() |
![]() |
![]() |
#12 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.luas.ie/sorry-and-thank-y...-patience.html
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#13 | |
Regular Poster
Join Date: Feb 2009
Posts: 176
|
![]() Quote:
![]()
__________________
"We'd like to apologise for..." |
|
![]() |
![]() |
![]() |
#14 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() The message is from Brian Barrington, MD of Veolia.
__________________
|
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|