Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Drogheda-Balbriggan-Skerries-Donabate Line
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 01-06-2007, 19:29   #1
Rashers
Really Regular Poster
 
Join Date: Dec 2005
Posts: 431
Angry 17.50 Pearse - Dundalk

When I was on the DART precedding this suburban service, I noticed that there were 3 four carriage 29000 trains in the sidings south of Pearse, all seperated. I should have known this was a bad sign.
At 17.58, an announcement was made " Pearse that there was a technical fault on the 17.50 service, so the next service would be a northbound DART stopping at all stations to Malahide. A few minutes after the DART came through, a 4 carriage service arrived to replace the delayed 17.50 service. No apologies, no warning about the reduced service. Everyone pushed on at Pearse st, and most seemed to get on at Tara street. But passengers left behind at Connolly (including families with buggies), more at Howth junction, and with the crawl out to Malahide, more passengers left behind at Malahide (group with lots of bags). Those waiting in Malahide travelling to Dundalk (of which I assume there would normally be very few, except for today) would have a long wait for the next service....
Not a single announcement for the driver anywhere along the journey...overall delay = 20-25 minutes,
Rashers is offline   Reply With Quote
Unread 02-06-2007, 01:02   #2
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

I shared your pain on this particular train. I was getting on at Tara St and thought there might be a chance of a seat on a Friday (it does happen). Then the half length train showed up, and I had to run back from the front of the platform. The short train, and the fact that anyone early for the 18:20 will cram in meant this train was particularly packed, and there were a lot of people trying to get on at both Howth Junction and Malahide. I didn't check if they were correct, but one of the passengers getting on at Malahide commented that the next train was over an hour away.

The driver did make announcements apologising for the delay and the reduced capacity, but only in Balbriggan and Drogheda.
James Shields is offline   Reply With Quote
Unread 02-06-2007, 19:10   #3
Rashers
Really Regular Poster
 
Join Date: Dec 2005
Posts: 431
Default Announcements

Good idea of the driver till wait till Balbriggan - the worst of the overcrowding would have cleared by Balbriggan. I'd say they might have stopped the Dundalk fast train (18.40 ex Connolly) at Malahide to pick up those passengers left behind.....
Rashers is offline   Reply With Quote
Unread 17-10-2007, 18:42   #4
chuggachuggachoochoo
Regular Poster
 
Join Date: Sep 2007
Location: Drogheda
Posts: 51
Default 17/10/2007

Unscheduled stop in Portmarnock today. Then a bit of a delay at a standstill on tracks before continuing on to Malahide.
chuggachuggachoochoo is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 07:53.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.