Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Dublin Waterford
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 19-11-2010, 23:32   #1
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default 16:35 Heuston - Waterford now a 6car

For the last two Fridays the 16:35 to Waterford has being a full 6car set. It was badly needed and there is still a lot of over crowing.

Nov 12 - 6car set not (no Premier Car)
Nov 19 - 6car set with Premier Car)

What line has lost a 6 car premier set or have they got the set that was damaged fixed.
Jamie2k9 is offline   Reply With Quote
Unread 20-11-2010, 00:00   #2
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

18:05 to Portlaoise has been short 3 coaches quite frequently in recent weeks
Mark Gleeson is offline   Reply With Quote
Unread 12-11-2011, 01:30   #3
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

Why can't Irish Rail get the 16.35 to Waterford on Fridays right. Over the last 3 or 4 Fridays its being 2 by 3 cars. They use a 6 car set every other day (even Saturday) but they don't on the bussiest day of the week, can sombody explain the sense in that. There is 72 less seats when the train is 2 3 car sets together. Every week the service is packed and passengers have to wait for the 17.35 as a result.
2200DMU is offline   Reply With Quote
Unread 12-11-2011, 16:38   #4
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

have checked IRN's spotter pages and it doesn't look like 22037 (6 car repaired) or any of the new 3-car sets have yet been put back into active service so things are gonna stay tight until then. Additionally 22033 is down a carriage.

As for Waterford, it does seem to have responded well to increases in service, but it's going to be tough to keep that up without putting on more loops, for which there is no money. Is all that demand Dublin-Waterford or could a Dublin-Carlow or Dublin-Kilkenny run soak up some of it (and is there even enough slots for that)?
dowlingm is offline   Reply With Quote
Unread 12-11-2011, 18:12   #5
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

If it when non stop to Athy it would help but there has being a lot more passengers getting off in Waterford compared to last year.

Serving celbridge, nass and kildare is pointless when they could run a service to Kildare at 16.40 even if it was for a friday only.
2200DMU is offline   Reply With Quote
Unread 12-11-2011, 19:38   #6
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
have checked IRN's spotter pages and it doesn't look like 22037 (6 car repaired) or any of the new 3-car sets have yet been put back into active service so things are gonna stay tight until then. Additionally 22033 is down a carriage.
22033 may be down a carrage but what makes Friday different to Mon, Tue, Wed, Thur and Sat when there is a 6 car set to operate the service.

22037 its being back with a while it should be ready for service soon, have seen it out on test a few times.

22033 is the engine etc being repaired here in Ireland or are they sending it away? and do we have a timeframe for it to be fixed. The fire was close to 2 months ago.
Jamie2k9 is offline   Reply With Quote
Unread 12-11-2011, 20:45   #7
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by Jamie2k9 View Post
22033 is the engine etc being repaired here in Ireland or are they sending it away? and do we have a timeframe for it to be fixed. The fire was close to 2 months ago.
Engines can easily be swapped in and out. One wonders is there more serious damage.
__________________
Colm Moore is offline   Reply With Quote
Unread 12-11-2011, 23:16   #8
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Engines can easily be swapped in and out. One wonders is there more serious damage.
exactly my point.....
Jamie2k9 is offline   Reply With Quote
Unread 13-11-2011, 21:01   #9
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

That they removed the carriage from the set implies they couldn't do without the set for however long the damage will take to repair - so perhaps a tender is in the works.

EDIT: Interesting rumourmongering over on IRN, hopefully only spoofing:
Quote:
The Koreans have pulled a fast one supposedly and they don't appear to be as well screwed together as the first lot. IE not too happy about it I'd imagine. Only a matter of time before the press pick up on this and Barry will be busy explaining why.

Last edited by dowlingm : 13-11-2011 at 21:05.
dowlingm is offline   Reply With Quote
Unread 13-11-2011, 23:49   #10
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Given IE had staff on the production line in Korea, if there was anything serious the train would never have left factory. The trains have been out on the mainline at high speed so there is nothing that serious. For instance all the power sockets need to be replaced, IE bike rack, decals, new CIS software and a whole other pile of modifications to be made. It could be something simple like a defective gearbox, that grounded the early 29k fleet for some time.

The other answer is, if IE 'accept' a train into passenger service they must pay and take ownership. If you had a cash flow issue finding 6 million or so per set might be a problem. So could be a case of wait for the budget etc. Recall how Irish Rail got 36 29k coaches and 33 ICR coaches out of the end of year accounts shake down.

Regardless there is a delay and thats not good.
Mark Gleeson is offline   Reply With Quote
Unread 18-11-2011, 21:20   #11
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Good news finally - 22037 is back in revenue service. Hopefully this is a net-up and not simply another 6 car set yanked into the blue shed at Heuston for tinkering.

http://thewandererphotos.smugmug.com...622487_zB6jfhr
dowlingm is offline   Reply With Quote
Unread 18-11-2011, 21:42   #12
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

16.35 was a 6 car today, hopefully it stays like this after I gave IR a mouth full about it.
2200DMU is offline   Reply With Quote
Unread 18-11-2011, 23:23   #13
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The fleet has an 6 extra coaches as of sometime this week as set 37 is back in service.

The difference between a standard only 6 coach and 2*3 coaches is 22 seats, a first class 6 coach is about 6 seats less in total vs 2*3. So be careful what you wish for...

Last edited by Mark Gleeson : 18-11-2011 at 23:28.
Mark Gleeson is offline   Reply With Quote
Unread 20-11-2011, 22:54   #14
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

Quote:
Good news finally - 22037 is back in revenue service. Hopefully this is a net-up and not simply another 6 car set yanked into the blue shed at Heuston for tinkering.
On Saturday it was taken out of service after stones were thrown and shattered the drivers window while operating 17.05 to Tralee. When to Portlaois this morning to get repaired.

Last edited by 2200DMU : 20-11-2011 at 22:57.
2200DMU is offline   Reply With Quote
Unread 30-01-2012, 18:50   #15
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

IE have sorted out the problem and its now always operated by 22041-22045 sets over the last 6 week or so. They also said they should be changes when the new timetable comes into affect around April (booking system suggest Sunday 15 April) Will they being publishing a draft like last year?
2200DMU is offline   Reply With Quote
Unread 30-01-2012, 18:55   #16
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

There is no expiry on the current timetable, it will simply roll forward as before.
Mark Gleeson is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 00:57.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.