|
01-09-2012, 08:33 | #1 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
KRP performance
Had occasion recently to travel on the 1940 Heuston to Kildare. 3-car ICR, about 60 passengers on departure.
Parkwest, 2 boarded, no exits. Clondalkin/Fonthill, no boardings or exits. Adamstown, 4 exits Hazelhatch, 2 exits Sallins, 22 exits Newbridge 16/18 exits Kildare 12/14 exits Maybe some scope for economy in respect of the KRP stations ? Another noticeable feature of the trip was the struggle the driver faced in checking his speed so as not to have to idle unduly at the KRP stations. Despite barely hitting 40 mph before Hazelhatch, it was still necessary to stop at these stations for almost a minute to avoid early departures. This nonsense represents a gratuitous delay of around 7 minutes. The schedule from Hazelhatch to Newbridge is much tighter and requires rapid acceleration to line speed and efficient braking to keep the 16 minute schedule for the 15½ miles. Twelve minutes is allowed for the final portion of the trip, the 4½ miles from Newbridge to Kildare, an average speed of 22.5 mph ! Needless to say, a slighly late departure from Newbridge was turnred into a magically early arrival in kildare. Amazing how such a short trip reveals so much about Irish Rail's continued failure to exploit its assets, in this instance a 110 mph capable train plodding around way below its capabilities. What should be a 38 minute trip is thus transformed into a 50 minute schedule. Roll this up nationwide and you get a waste of resources in terms of track, capacity, crews and equipment as well as unecessarily uncompetitive schedules. Last edited by Inniskeen : 01-09-2012 at 08:36. |
01-09-2012, 12:32 | #2 |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
There is a Kildare-Heuston service that runs Mon-Sat that is not even advertised in the timetable on line but is in the printed one. Departs Kilddare at 14.44 and arrives Dublin at 15.34. Seems strange not to have it on line.
Newbridge-Sallins is tight for all services and going by real time every train that passes through is late as it takes an average of 36 seconds longer than actually scheduled, with it slightly less for non stop services than don't serve Newbridge. Last edited by Jamie2k9 : 01-09-2012 at 12:38. |
01-09-2012, 14:31 | #3 |
Member
Join Date: Oct 2006
Posts: 395
|
First of all, no IE train is capable of running at 110mph; the fastest is 100mph. Most of the route to Kildare is max 90mph apart from the 4-track which is 70mph for stopping trains (slow track) and 100mph for expresses (fast track).
Trains that terminate at Kildare are given some extra time compared to those that continue past Kildare. The reason is that some trains terminate at platform 2, the up platform, and are generally held on approach to Kildare by the signalling system as they have to cross over. Sometimes they may have to wait if an up train is running late. Example - the 2210 to Portlaoise is rostered at 42 mins and only 6 mins from Newbridge while the terminating trains have 45-50 mins. |
01-09-2012, 16:09 | #4 |
Member
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
|
It's interesting that the stations that are proposed to get DART-level service are also the ones with the least passengers right now. Maybe it will be a case of build it and they will come, but it's a real shame electrification and quad tracking never made it out to Kildare town given the heavier existing usage of services past Hazelhatch.
|
01-09-2012, 19:49 | #5 | |
Member
Join Date: Mar 2006
Posts: 112
|
Quote:
Any reason now to justify the spend on the KRP? |
|
01-09-2012, 19:58 | #6 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
Quote:
|
|
01-09-2012, 17:33 | #7 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
Quote:
|
|
01-09-2012, 18:08 | #8 |
Member
Join Date: Oct 2006
Posts: 395
|
https://www.hyundai-rotem.co.kr/Eng/...ail1_pop13.asp
Direct from Rotem - max speed 161kph or 100mph. Agreed timetables could be tighter and there is too much sitting at stations waiting for the clock. IE are not alone doing this as other railways also leave extra time at stops. The 11 mins Newbridge-Kildare is excessive; 8 mins should be sufficient for a terminating train and 6 otherwise. |
01-09-2012, 18:48 | #9 |
New to the board
Join Date: Jun 2011
Posts: 25
|
Rotem designed the trains to reach speeds of 100mph this doesn't mean once the trains hits 100 it will stop accelerating, I imagine the trains can reach higher speeds up to 110mph if not more, although for safety reasons are only permitted to travel 100mph.
|
Thread Tools | Search this Thread |
Display Modes | |
|
|