View Single Post
Unread 16-02-2018, 16:03   #18
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Is that the Chapelizod Bypass bridge? That would be a problem whether the line is going to the PPT or into Heuston Station (or for any future mainline electrification). Admittedly it would be avoided by an Interconnector surfacing at Inchicore.

Doesn't sound like an insurmountable problem. Maybe just expensive?
James Shields is offline   Reply With Quote