View Single Post
Unread 16-05-2017, 22:18   #4
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

This is a lot of disruption given that the layout is now relatively simple, the points have already been renewed and presumably wired back to a location that they can be easily connected to the new system. Are they totally renewing the track and re-building the platforms as well ?
Inniskeen is offline   Reply With Quote