Quote:
Funds and fleet management. For fleet management, there is a motivation to run the newest fleet to the maximum (especially if still under warranty) until the decision is made that fleet with the least remaining life can be retired.
|
I guess you may have a point.
Wonder have/will they consider reducing the number of 4 coach units in favor of increase a few to 5. They would be higher capacity than 5 FC sets (+36 sets).
No evidence but suspect it could fit the bill for both evening Longford services and return two sets of 8 2900 to Dublin. 4 coach was to small (264 seated) but 336 seated and some standing, it surly should be reasonable adequate. I don't ever see 6/7 sets been scheduled for such a route. Would also address some other route issues.
It would also see if purchasing middle coaches stacks up for Dublin region. From day 1, I always questioned the level of 4 coach units and always felt it was a little to much.
25 4 coach sets, drop to 19 4 coach, 3 5 coach, 3 extra 3 coach on a trail basis.