Originally Posted by Mark Gleeson View Post
Conyngham Rd is the problem

I would be confident the Chapelizod bypass bridges would be high enough, but there is plenty of space either side to drop the track if needed

So where did 2 billion go in Dublin rail

Electrify 250
New fleet 600-800
New depot 50
New train control centre 50
KRP2 (4 tracks Inchicore onwards) 150?
Level cross elimination?

The real problem here is short term planning means long term cost. The new plans require electrification of Heuston station (which will be painful and the Phoenix park route and possibly 4 tracks down the gullet section which has been advised against. The original plan required no works inwards from Inchicore
Is the R839 the big issue over the gullet, reducing the embankment along the N4 is doable but no way to replace that over bridge with getting very creative and speeding a massive amount of money.