The fact that the metal portion of the viaduct is not the original must lessen the value of its status as a listed structure, and replication of the steel in the original position on the bridge supports would, as suggested, allow the bridge be again doubled ( or with a design cantelevered off the masonry structure, possibly trebbled).
What improvements to train paths etc would doubling allow?
|