View Single Post
Unread 16-02-2018, 14:08   #11
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The plan for the Metro is basically the Metro north plan continuing underneath the Harcourt Street line and then resurfaces at Beechwood

Two options
1. Dual running (completely doable), Metro the Sandyford and Luas onwards
2. Luas has a terminus at Beachwood and runs to Broombridge/Finglas

In both cases the lines will be physically connected

Its starting to look a lot like Cologne and Bonn with its not sure if I'm a tram or metro setup
Mark Gleeson is offline   Reply With Quote