Quote:
How are trains signalled from the platforms at present with the central box closed?
|
All manually, one train in the section at a time. The crossovers at end of P5 are being manaully swtiched to up and down lines and then Waterford West takes over where the train moves form Limerick line to Dublin line and CTC starts once it swtiches over.