Comment from Barry Kenny.

Quote:
Originally Posted by Barry Kenny
As you know, we've had temporary working arrangements in place since the start of January at Waterford while the cliff face works were continuing.

The cliff works are taking longer than anticipated so we have made the decision to remove a couple of point ends next week to make the temporary arrangements more efficient. This is not irreversible and does not indicate a longer term plan.

As we've said in public already, there are decisions ahead in the shorter term regarding possible operation of all signalling in the station area from Waterford West cabin, and in the longer term about the station as a whole given the increasing frequency of flood disruption over this and recent winters.

However, the shorter term issues are still under consideration, and there has been no detailed analysis of the longer term issues at this point (and needless to say, no funding to address longer term issues either). So as of now, all that is happening is ongoing cliff face works and minor points rationalisation to facilitate the temporary working arrangements in the station area.