Quote:
Originally Posted by dowlingm
It's a bit of a catch 22 - if you avoid energy costs by right-sizing the train to the time of day you add the costs involved with pulling the trains into the yard and assembling/splitting the consists.
|
But the already have a mix of 4/6/8 car trains, no need to assemble/split, just move from siding to platform.