Thread: Hurricane
View Single Post
Unread 15-10-2017, 20:27   #3
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by Traincustomer View Post
Presumably this is down to ensuring the safety of staff of manually operated level crossings in windswept locations (which of course is a sensible precaution).
IMO its rather ensuring routes with high demand are kept operating where possible. A line like Limerick-BB could sustain a lot more damage (given its condition) and require a much more detained inspection afterwords taking up resources which could be put to use elsewhere
.
Jamie2k9 is offline   Reply With Quote