7:59 Howth Bray delayed by 9 due to operational difficulties (possibly caused by 6:20 ex Longford) should be an 8 coach train was in the past but its been hit an miss this week. The 7:18 from Drogheda was on time so thats the best guess
Operational difficulties must be the most useless excuse going
There is a pinch point at Connolly at about 8:30-8:35 as the 7:45 Maynooth Connolly and 7:27 Drogheda Connolly (both additional as of this years timetable) arrive 8:28am thats a lot of people needing an onwards transfer southwards
Last edited by Mark Gleeson : 16-12-2005 at 12:02.
|