we've long campaigned for the PPT to be used and despite being told on many an occasion by IE that it couldnt be done, lo it has been. (almost).
the line is being gradually improved. In the same way that the forth bridge is being gradually painted.
We've been advocating our ideas on the nenagh timetable since about 2007 as far as i remember.
Yes, it would be gross folly to have it close, irish railway history is replete with such folly.
__________________
We are the passengers
|