Quote:
Originally Posted by James Howard
What is the current setup for this line for signalling and level crossings? Are these still all manual or have they largely been sorted out? If they're still stuck needing a couple of dozen people just to keep the line open, it's hard to see any long-term future for the line.
|
All signalled manually via three signal boxes at Killonan Junction, Birdhill and Roscrea.
All level crossings bar one are manually operated (and there are a lot!).