Thread: Too many staff?
View Single Post
Unread 08-01-2018, 12:02   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Level crossings are being replaced but its working through based on priority and also future plans. So if there are plans to build a bridge or close a road the manual gates remain (see Maynooth line)

So Dublin Rosslare/Galway/Westport/Waterford should be 100% automatic. Dublin Cork has a small number left which are being slowly eliminated.

The capital cost is about 1 million each and an ongoing maintenance cost, its generally rolled into the capital cost of signalling upgrades