View Single Post
Unread 14-07-2006, 20:18   #15
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Quote:
Originally Posted by colmoc
what kind of freaquencies will the metro be capable of running at
In theory the Metro will be capable of running at 90sec intervals in the central section shared by Metro North and Metro West, and 3 min intervals where the lines seperate.

Quote:
are the metro units going to be the full 90m in length from the start of service
I'm not sure if the trains will be full length from the start. It would make a lot of sense to start out with shorter trains and add capacity as it is needed.

Quote:
Essentially what is proposed is not a metro but trams doubled up. As repeatedly remarked by frank mcdonald , if several tram lines were built through the city (4/5), then the city centre could be closed off to cars.
I still think Metro is needed. Luas would be painfully slow if you tried to replace the orbital Metro with it, although I guess you could subsititute it for several arterial lines. The orbital Metro was recommended by Platform for Change and has the advantage of connecting a lof of communities outside the city centre, eliminating the need for many journies through the centre.
James Shields is offline