Am I mistaken in thinking that there are actually two four car DARTs one after the other northbound from Connolly, at 1747 and 1754, the first relatively lightly loaded and the second heavily overcrowded. Assumming that "all carriages are in use" at this time, would it not make sense to combine the two trains into an 8 car set and run this to Malahide. This would reduce overcrowding a little as well as reducing congestion.
|